My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />doubt or question as to the true meaning of any provision in the Contract Documents. The <br />ENGINEER's decision thereon shall be final. Annotated dimensions on drawings shall <br />govern and work not dimensioned shall be as clarified by the ENGINEER. Work not <br />particularly shown or specified shall be the same as similar parts that aro shown or <br />specified. Materials of work described in words which have a well-known tochnical or trade <br />meaning shall be deemed to refer to such recognized standard. <br />6.40.2 The CONTRACTOR shall verify all dimensions, quantities, locations, materials and details <br />shown our ifie Plans, Supplementary Drawings, schedules or other data received from the <br />Architect or Engineer, and shall notify him of all errors, omissions, conflicts and <br />discrepancies found therein. Failure to discover or correct errors, conflicts or <br />discrepancies shall riot relive the CONTRACTOR of full responsibility for unsatisfactory <br />work, faulty construction, or improper operation resulting therefrom nor from rectifying such <br />condition at his own expense. He will not be allowed to take advantage of any error or <br />omissions, as full instructions will be furnished by the Architeel or Engineer, should any <br />error or omissions be discovered. Ail schedules are given for the convenience of the <br />Engineer and CONTRACTOR and are not guaranteed to be complete. <br />RotatedWork at Site. <br />7.1 OWNER may perform other work related to the Project at the site by OWN'ER's own <br />forces, have other work performed by utility owners or let other direct contracts therefor <br />which shalt contain General Conditions similar to those. If the fact that such other work is <br />to be performed was not notod in the Contract Documents, written notice thereof will be <br />given to CONTRACTOR prior to starting any such other work; and, if CONTRACTOR <br />believes that such performance will involve additional expense to CONTRACTOR or <br />required additional time and the parties are unable to agree as to the extent thereof, <br />CONTRACTOR may make a claim therefor as provided in Articles 11 and 12. <br />7.2 CONTRACTOR shall afford each utility owner and other contractor who is a pasty to such <br />a direct contract (or OWNER, if OWNER is performing the additional work with OWNER's <br />employees) proper and safe access to the site and a reasonable opportunity for the <br />introduction and storage of materials and equipment and the execution of such work, and <br />shall properly connect and coordinate the Work with theirs. CONTRACTOR shall do all <br />cutting, fitting and patching of the Work that may be required to make its several parts <br />come together property and integrate with such other work. CONTRACTOR shall not <br />endanger any work of others by others by cutting, excavating or otherwise altering their <br />work and will only cut or alter their work with the written consent of ENGINEER and the <br />udTet s whose work will be artectea. 1 tic auties and responsibilities of CONTRACTOR <br />under this paragraph are for the benefit of such utility owners and other contractors to the <br />extent that there are comparable provisions for the benefit of CONTRACTOR in said direct <br />contracts between OWNER. and such utility :owners and other contractors. <br />7.3 If any part of CONTRACTOR's Work depends for proper execution or results upon the <br />work of any suck other contractor or utility owner (or OWNER), CONTRACTOR shall <br />inspect and promptly report to ENGINEER in writing any delays, defects or deficiencies in <br />such work that render it unavailable or unsuitable for such proper execution and results. <br />CONTRACTOR's failure to report will constitute an acceptance of the other work as fit and <br />proper for integration with CONTRACTOR's Work ew:opt for latent or nonapparent defects <br />and deficiencies in the other work. <br />GENERAL C0N17I'rI()P75 <br />GC - 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.