My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />Coordination: <br />74 If OWNER for the rfoof other the Project at the <br />=e.the p"."=/ov'ua"iz""""=","..have "°""°. an d ros po n si bi ,y.~~°°",=°=. <br />~~�~� nYthe eoUvime- the various prime contractors will boidentified * the Supplementary <br />| <br />Conditions, and the specific matters mbecovered hysuch authoriity andresponsibility will <br />, <br />be Itemized, and the extent of such authority and responsibilities W11 be provided, in the <br />Supplementary Conditions. Unless otherwise provided inthe Supplementary Conditions, <br />neither OWNER nor ENGINEER shall have any authority or responsibility in respact of <br />such coordinMon. <br />81 OWNER shall issue all nommunicuU000mCONTRACTOR through ENGINEER. <br />8.2 in case of termination of the employment of ENGINEER, OWNER shall appoint an <br />engineer against whom CONTRACTOR makes no reasonable objection,whose status <br />under the Contract Documents shall bethat u[the former ENGINEER. Any dispute in <br />cuunmnUonwith such appointment shall bosubject toarbitration. <br />8.8 OWNER mhe8 Yum|mn the data required of OWNER under the Contract Documents <br />promptly and shall make payments mCONTRACTOR promptly after they are due an <br />provided in paragraphs 14,4 and 114.13. <br />8.4 OVVNER'sduties |n respectnfproviding lands and easements and providing engineering <br />surveys to establishreference ph <br />4.2 refers huOVVNBR's identifying and making available tuCONTRACTOR copies of <br />reports oYexpYunsfionm and tests of subsurface conditions at the site and in existing <br />structures vvh\uh have been utilized by ENGINEER in pn,pmhnV the Drawings and <br />Specifications. <br />8.5 OVVNER'mresponsibilities hrrespect nf purchasing and maintaining liability and property <br />insurance are set forth |nparagraphs 5.5and bJ2. <br />8.6 OWNER ioobligated toexecute Change Orders anindicated |nparagraph 1[i4. <br />8.7 OWNER's responsibility in respect of certain inspections, tests and approvals is set forth <br />mparagraph 13.4 <br />88 In connect -on with OWNER's right to stop Work or suspend Work, see paragraphs 1310, <br />a»d 1,5-1. Fa/agmyh 152 dum|u w4h ()VVNER'm 68hn to tmnninmnn on/viva» o, <br />CONTRACTOR under certain circumstances. <br />OVVNER'*Reprmaonta8ve: <br />9,1 ENGINEER wNbyOVVNER'm representativeduring the construction period. The duties <br />apd responsibilities and the |inhobons of authority of ENGINEERas OVVNER'm <br />. <br />representative during construction are set forth mthe ConlrauDocuments and shall not <br />be extended without written consent of OWNER and ENGINEER. <br />cmsEnxL cnwozrzowo <br />GC - 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.