Laserfiche WebLink
40 <br />Vlaft to Site: <br />9.2 ENQ|NEERwN make visits to the site at intervals appropriate to the various stages of <br />constnif,ton to observe the progress and quality of the executed W" and to determine, <br />in genaral, if the Work is procGadlng in accordance %vith the Contract Documents. <br />ENGINEER will not be required to make exhaustive or continuous onsite inspections to <br />check the quality or quantity of the Work. ENGINEER's efforts will be directed toward <br />providing for OWNER a greater degree of confidence that the completed Work will <br />conform to the Cantract Documents. On the basis of such visits and on-site observations <br />as an experionced and qualified design i ENGINEER vWU keep OWNER <br />informed of the progress of the Work and will ondeavor to guard OWNrM against defects <br />and deficiencies inthe Work. <br />Project Representation, <br />3.3 If OWNER and ENGINEER mgmo EWUNEER will fum|sA o Resident Project <br />Representative to mnaiwt ENGINEER in observing the parfnnnonoo oYdbm Work. The <br />dudoo, rmoponuib||iUoo and limitations of authority of any such Resident Project <br />Representative and assistants are set forth in Section 00801. Exhibit B, hUad ^Dudma' <br />Responsibilities and Limitations of the Authority of Resident Project Representative". If <br />OWNER designated another agent to represent OWNER at the site who is not <br />ENGINEER's agent or employee, the duties, responsibilities and limitations of authority of <br />Such other person will bunoprovided inthe Supplementary Conditions. <br />Clarifications and Interpretations: <br />9.4 ENGINEER vv||[ issue with moonnob|e promptness euuh written o|md8omWnnm or <br />interpretations of the requirements of the Contract Documents (in the form of Drawings or <br />otherwise) as ENGINEER may dm(nnn|ne nouoonory, which nhoU be consistent with or <br />reasonably inferable from the nvony|>intent of the Contract Documents. If CONTRACTOR <br />believes that a written clarification or interpretations justifies an increase in the Contract <br />Price or an extension of the ContnontT|mo and the parties are unable to agree tuthe <br />amount orextent thereof, CONTRACTOR may make eclaim therefor ae provided in Article <br />11 or Article 12, <br />Authorized Variations inWork: <br />8.5 ENGINEER may authorize minor variations in the Work from the requirements of the <br />Contract Documents which do not involve an adjustment in the Contract Price or the <br />Contract Time and are consistent with the overall intent of the Contract Documents. Thome <br />may be accomplished by Field Order and will be binding on OVVNER, and also on <br />CONTRACTOR :h::;ho||1,hIaVVurkIII .o1.eJpmmpdy. F[ONTRAGTURoehevem <br />that a Field Order jusfifies an increase in the Contract Price or an extension of the Contract <br />Time and the parties are vneb/e to agree as to ,no amount or extant thereof, <br />CONTRACTOR may make aclaim therefor muprovided |nArticle 11or12. <br />Rejecting Defective Work: <br />9.6 ENGINEER will have authority to disapprove orreject Work which ENGINEER believes <br />to be defeclive, and will also have authority to require special inspection or testing of the <br />Work as provided in paragraph 13.9. whether or not the Work is fabricated, installed or <br />completed. <br />Gamomm coxozr/nws ^, <br />GC - co <br />6W <br />