My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-245
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 3:30:34 PM
Creation date
11/16/2023 3:22:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/21/1999
Control Number
1999-245
Entity Name
Sheltra & Son Construction
Subject
Contract and Bid Award for Shooting Range Site Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />CONTRACTOR's obligation to perforin the Work in accordance with the Contract <br />Documents (except as provided in paragraph 11.16). <br />walver of Claw s <br />�Q",� ��4 4'��'#uC\�+�a�id �CCF]�CBR� 43� �lC'lc1'� �1�'SCRE14lC@llll CACISCtCIi,Ce'. <br />14-16.1 a tvafvar of all cfafms by GMEK agaritsf GM TKAGr&V, excepcOIMMs <br />11�v1ti�i ubm mOVA vu'&. `twim IM'&Wob "414 )V, -Awkmm 6t% tllld <br />it amcuart PrsRMI [a 9afflafflya T11.1 I ar (MM (0019 W HM911 WIN W4 <br />E011111 0011U rOM9 or M8 fi::FMI of any 0091 J=01101d5 <br />ii TGR MM 11 RM "M WON � 91411K M �ri 14r -f;, 0; 115 r"a 1 <br />1�+�f3t�f til l:r�la� r�xtt� ior�? c`aiir%+iriiirt� onriii��irrrir,r� nirci�i,` iii© narrunoi <br />-t2r iii' v _$i LAS i�Yi�Sf '${r IYiYr iC_T_f3 ifdiiii:Y_i76f_Fif� f{$UK rJ 56fffFK nolt4s F1 Im 10%O o <br />s�`€�cnr€�s�stss§sc�r€srs's3�sss3cs�rrr�rr�iarrrsrra <br />OWNER May Suspend Work: <br />15.1 OWNER may, at any time and without cause, suspend the Work or any portion thereof for <br />a period of not more than ninety (94) days by notice in writing to CONTRACTOR and <br />ENGINEER which will fix the date on which Work will be resumed. CONTRACTOR shall <br />resume the Work on the date so fixed. CONTRACTOR shall be allowed an increase in the <br />Contract Price or an extension of the Contract Time, or both, directly attributable to any <br />suspension if CONTRACTOR makes an approved claim therefor as provided in Articles <br />11 and 12. <br />OWNER May Terminate: <br />15.2 Upon the occurrence of any one or more of the following events: <br />15.2.1 if CONTRACTOR commences a voluntary case under any chapter of the <br />3ankruptcy Code (Title 11, United States Code), as now or hereafter in effect, or <br />it CONTRACTOR takes any equivalent or similar action by filing a petition or <br />otherwise under any other federal or state law in effect at such time relating to the <br />bankruptcy or insolvency; <br />15.2.2 if a petition is filed against CONTRACTOR under any chapter of the Bankruptcy <br />Code as now or hereafter in effect at the time of filing, or if a petition is filed <br />n L'na 2n,; suclh Gqu, o:Gnt u, aililiipr relief agairI54 CONTRACTOR under any <br />oftr federal or state law in effect at the time relating to bankruptcy or insolvency; <br />15.2.3 if CONTRACTOR makes a general assignment for the benefit of creditors; <br />15.2.4 if a trustee, receiver, custodian or agent of CONTRACTOR is appointed under <br />applicable law or under contract, whose appointment or authority to take charge of <br />property of C. iNTRACTOR is for the purpose of enforcing a lien against such <br />property or for the purpose of general adrmi iistration of such property for tare <br />benefit of CONTRACTOR's creditors; <br />15.2.5 if CONTRACTOR admits in writing an inability to pay its debts generally as they <br />become due; <br />15.2.6 if CONTRACTOR persistently fails to perform the Work in accordance with the <br />Contract Documents (Including, but not limited to, failYrre to supply sufficiently <br />GENERAL CONDITIONS <br />GC -- 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.