My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-247
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 10:22:51 AM
Creation date
12/19/2023 10:22:03 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C&W Ref. 66418.CS ADDITIONAL SERVICES WTP/HSPS/Wells/PLC/SCADA <br />shall include having the fiber terminated and communications established with <br />the plant PLC via FO cable (new and existing including terminations and <br />splices). Expected completion dates between September and October, by <br />10/26 <br />3. HSP 1-3 completion, provide inspection (this is covered mostly by the original <br />CS proposal). <br />4. Acid and scale inhibitor improvements to be completed by 8-30-23 (this is <br />covered by the original CS proposal). <br />5. Feedwater and concentrate piping @ CTF (this would include all VFD <br />equipment including replacing the feed water pump soft starters for VFD. <br />Expected completion date 9-12-23. <br />6. NF Train 2 begin performance testing and checking controls and NF RIO PLC <br />Panel along with motorized valves and NF instruments. 9-15-23 expected <br />completion date. <br />7. NF Train 3 begin performance testing and checking controls and NF RIO PLC <br />Panel along with motorized valves and NF instruments. 11-2-23 expected <br />completion date. <br />8. NF Train 4 begin performance testing and checking controls and NF RIO PLC <br />Panel along with motorized valves and NF instruments. 12-11-23 expected <br />completion date. <br />9. NF Train 1 begin performance testing and checking controls and NF RIO PLC <br />Panel along with motorized valves and NF instruments. 1-18-24 expected <br />completion date. <br />10. Attend a substantial completion walk through and provide a punch list of the <br />findings, expected date 3-15-24 <br />11. Attend a final completion walk through and provide a punch of the findings, <br />expected date 5-17-24 <br />12. Provide as -built drawings based on Contractor provided redlines. <br />CONSTRUCTION SERVICES <br />Coordination <br />Kimley Horn and Associates <br />Owner <br />Contractor <br />Progress Monthly Meetings <br />Startups and Progress field inspections, some during equipment <br />startups <br />Attend a startup and testing field visit and provide a punch list to each well <br />Site including confirming FO communications between each well PLC <br />panel and the plant SCADA. <br />Attend a startup and testing field visit and provide a punch list to each NF <br />Train skid and its field instruments, actuators, and RIO NF PLC panels. <br />Attend startup and testing of various PLC and control panels, like the <br />
The URL can be used to link to this page
Your browser does not support the video tag.