CHANGE ORDER NO. 1
<br />DESCRIPTION OF ITEMIZED CHANGES
<br />PROJECT NAME: 6th Avenue Milling & Resurfacing
<br />IRC -1638 BID NO. 2022008
<br />110
<br />RIPuble W.,WENGINEERING DIVISION PROJECTSt16386M Avenue US -1 W 21st Sheet Resurtsdng (SCOPh1-AAm1nAgeMa Usms%Pm(ed CbssoutWOIDSURG1838_FCO_20231121
<br />xi,,,
<br />110410
<br />REMOVAL OF EXISTING CONCRETE PAVEMENT, REMOVAL OF
<br />EXISTING CONCRETE
<br />SY
<br />44.95
<br />20.20
<br />907.99
<br />337 7 83
<br />ASPHALTIC CONCRETE FRICTION COURSE (TRAFFIC C)
<br />(FC12.5) (PG 76-22
<br />TN
<br />662.76
<br />151.81
<br />100 613.60
<br />520110 ICONCRETE
<br />CURB & GUTTER, TYPE F
<br />LF
<br />7.00
<br />17.69
<br />123.83
<br />5222
<br />CONCRETE SIDEWALKS & DRIVEWAYS, 6e THICK, (3,000PSI
<br />FIBERMESH REINFORCED)
<br />SY 1
<br />476.37
<br />47.62
<br />22684.74
<br />5272
<br />DETECTABLE WARNINGS
<br />SF
<br />221.50
<br />41.63
<br />9,221.05
<br />630211
<br />CONDUIT, FURNISH & INSTALL, OPEN TRENCH
<br />LF
<br />16.00
<br />7.81
<br />124.96
<br />6331 123
<br />FIBER OPTIC CABLE F&I UNDERGROUND 49-96 FIBERS
<br />LF
<br />840.00
<br />4.16
<br />3,494.40
<br />635211
<br />PULL & SPLICE BOX F&I, 13" X 24" COVER SIZE
<br />EA
<br />37.00
<br />749.39
<br />27,727.43
<br />635212
<br />PULL & SPLICE BOX, F&I, 24e X 26e COVER SIZE
<br />EA
<br />11.00
<br />1696.53
<br />18,661.83
<br />635213
<br />PULL & SPLICE BOX F&I, 30e X 60e COVER SIZE
<br />EA
<br />3.00
<br />4738.82
<br />14 216.46
<br />706 1 1
<br />RAISED PAVEMENT MARKER, TYPE B, WITHOUT FINAL
<br />SURFACE MARKINGS
<br />EA
<br />88.00
<br />3.64
<br />320.32
<br />711 11123
<br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 12e FOR
<br />CROSSWALK AND ROUNDABOUT
<br />LF
<br />467.00
<br />3.02
<br />1,410.34
<br />711 11125
<br />THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP
<br />LINES AND CROSSWALK
<br />LF
<br />51.00
<br />6.04
<br />308.04
<br />711 16201
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW,
<br />SOLID 6-
<br />GM
<br />0.239
<br />4126.83
<br />986.31
<br />1080 21108
<br />UTILITY FITURE VALVE BOX FURNISH & INSTALL 8-
<br />EA
<br />12.00
<br />884.69
<br />10 616.28
<br />327 70 6
<br />MILLING EXISTING ASPHALT PAVEMENT 1-1/2- AVG DEPTH
<br />SY
<br />1557.00
<br />3.41
<br />5 309.37
<br />4256
<br />VALVE BOXES ADJUST
<br />EA
<br />7.00
<br />624.49
<br />4,371.43
<br />57012
<br />PERFORMANCE TURF SOD
<br />SY
<br />3905.00
<br />3.12
<br />12 183.60
<br />71111170
<br />THERMOPLASTIC STANDARD WHITE ARROWS
<br />EA
<br />9.00
<br />57.24
<br />515.16
<br />711 16101
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, WHITE,
<br />ISOLID, 6-
<br />GM
<br />0.01
<br />4126.83
<br />41.27
<br />71116131
<br />THERMOPLASTIC, OTHER SURFACES, WHITE, SKIP, 6e, 10-30
<br />SKIP
<br />GM
<br />0.013
<br />1032.36
<br />13.42
<br />711 16231
<br />THERMOPLASTIC, STANDARD -OTHER SURFACES, YELLOW,
<br />SKIP 6-
<br />GM
<br />0.026
<br />1032.45
<br />26.84
<br />WCD#1
<br />DRAINAGE WORK 690 6TH AVENUE
<br />LS
<br />1.00
<br />98172.26
<br />98 172.26
<br />WCD#2
<br />DRAINAGE WORK 1610 TO 1640 6TH AVENUE
<br />LS
<br />1.00
<br />97028.44
<br />97,028.44
<br />999-25
<br />FORCE ACCOUNT
<br />LS
<br />1.00
<br />180 000.00
<br />180 000.00
<br />SUBTOTALS
<br />I
<br />1
<br />1 217,661.79
<br />1 391,417.57
<br />6th Avenue Milling & Resurfacing TOTAL
<br />1 ($173,755.78
<br />110
<br />RIPuble W.,WENGINEERING DIVISION PROJECTSt16386M Avenue US -1 W 21st Sheet Resurtsdng (SCOPh1-AAm1nAgeMa Usms%Pm(ed CbssoutWOIDSURG1838_FCO_20231121
<br />
|