Mr. Himanshu Mehta, P. E. <br />14 November 2023 <br />Page 2 <br />PROJECT BACKGROUND <br />The IRCL facility is located in southern Indian River County, east of Interstate 95, south of Oslo <br />Road, and west of Rangeline Road in Vero Beach, Florida. The SWDD administers the <br />management and operation of the Class I landfill at the IRCL facility. The Class I Landfill <br />includes the closed Segment 1/Infill/Segment 2 vertical expansion, and Segment 3 lateral <br />expansion (Segment 3). The total footprint area of Segment 3 is 76 acres and consist of eight <br />cells that are being constructed in phases as needed. Segment 3, Cell 1, directly east of and on <br />top of the east slope of Segment 2, was constructed in 2013. Segment 3, Cell 2 was constructed <br />in 2020. Republic Services of Florida LP (Republic), the operator of the Class I Landfill, has <br />estimated that filling of Cell 2 will be nearly completed by the end of Calendar Year (CY) 2023 <br />and has therefore recommended that SWDD considers construction of Cell 3 during CY 2023. <br />In order to expedite Cell 3 construction, SWDD would like to implement it in two phases, as <br />follows: <br />• Phase 1: Site preparation activities consisting primarily of the earthwork for construction of <br />the subgrade for Cell 3; the fill material will be obtained from off-site borrow sources with <br />the actual placement and compaction to be performed by a contractor through the <br />procurement process. <br />• Phase 2: Construction of the Cell 3 liner and leachate control systems to be performed by a <br />contractor selected through a separate procurement process. <br />On 22 September 2023 SWDD authorized Work Order 18 to Geosyntec to provide engineering <br />and construction support services related to Phase 1 Site preparation activities for Cell 3 liner <br />construction. The scope of services included preparation of construction documents, contractor <br />procurement support services, and construction -phase support services. ccccc <br />This proposal addresses the additional engineering design and construction support services <br />required to complete Phase 1 of the Project, including additional engineering design services <br />requested by SWDD, additional construction support services including additional geotechnical <br />testing required to substantially complete construction by the contractor. In addition, SWDD <br />requested that Geosyntec prepare a minor modification permit application to include leachate toe <br />drains in Cells 3 and 4 for submittal to FDEP prior to Phase 2 construction. <br />FL9363-01/ JL23067 Se«ment 3 Cell 3 site Preparation Amendment I .doe <br />esiginc.ers i scientists { innovators <br />