Mr. Himanshu Mehta, P. E. <br />14 November 2023 <br />Page 3 <br />PROPOSED SCOPE OF WORK <br />In additional to the original project scope of work this proposal presents the need for additional <br />scope including, additional geotechnical testing, preparation of additional construction drawings, <br />extended construction support services, and preparation of minor modification permit <br />application. For budgeting purposes, the additional scope of work is divided into the following <br />four phases: <br />• Phase 1 — General Consulting/Meeting Support/Project Management; <br />• Phase 2 — Preparation of Additional Construction Drawings; <br />• Phase 3 — Extended Construction -Phase Support Services; and <br />• Phase 4 — Minor Modification Permit Application. <br />Phase 1— General Consulting/Meeting Support/Project Management <br />Under this phase, Geosyntec will perform project management responsibilities, such as <br />correspondence with SWDD and FDEP, review of subcontractors' invoices, project <br />coordination, and administration including monthly invoicing. <br />Phase 2 — Preparation of Additional Construction Documents <br />This phase includes the additional effort made to re -align the perimeter road on the eastern edge <br />of Cell 4 as directed by Ronnie Jones of IRC SWDD. Additional Construction Drawings were <br />prepared utilizing the Segment 3 Expansion Permit Drawings prepared by Geosyntec in March <br />2010 and revised in November 2015. Construction control points were provided for <br />construction. <br />Phase 4 — Extended Construction -Phase Support Services <br />The originally approved Work Order assumed engineering support services for a 2 to 3 month <br />construction duration. As of October 31St, 2023, the Project has surpassed the 3 month projection <br />based on the contractor's schedule. The additional support projected to finish this project will <br />include an additional month of contracting services based on the contractors' current schedule <br />estimation. Therefore, Geosyntec will provide construction and engineering support services for <br />an additional month. This includes preparation and participation in weekly construction progress <br />meetings, preparation meeting minutes, and review of contractor's submittals including payment <br />application requests. <br />In addition, as part of this phase, a proposal provided by AACE for the additional work required <br />to complete the Project is included as Attachment A. Geosyntec will also continue to review all <br />FL9363-01/ J1,23067 Scemem 3 Cell 3 Site Praoaradon Ama:nilmcm I doc <br />vtyineeis I scientists I innovators <br />