My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-269
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 12:27:35 PM
Creation date
1/4/2024 12:26:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/12/2023
Control Number
2023-269
Agenda Item Number
15.B.1.
Entity Name
Geosyntec Consultants, Inc.
Subject
Amendment 1 to Work Order No. 18 for Segment 3 Cell 3 Site
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br />14 November 2023 <br />Page 4 <br />test results to ensure compliance with the project specifications and FDEP-issued permit for the <br />Class I Landfill. <br />Phase 6 — Minor Modification Permit Application <br />This phase includes the additional effort made to prepare a minor modification permit <br />application to add leachate toe drains along the north-eastern and north-western limits of both <br />Cell 3 of Segment 3 and the future Cell 4 of Segment 3.for submittal to the FDEP. At the request <br />of SWDD, Geosyntec scheduled and participated in a pre -application meeting with FDEP and is <br />in the process of finalizing the application for submittal to FDEP. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Phase 1 through 4 of this proposal is <br />summarized in the following table. A detailed budget estimate is provided as Attachment B. <br />Note that fee for the geotechnical testing is included in Phase 1. <br />• Phase 1 — General Consulting/Meeting Support/Project Management $3,308.36 <br />• Phase 2 — Preparation of Additional Construction Drawings $7,429.47 <br />• Phase 4 — Extended Construction -Phase Support Services $22,177.34 <br />• Phase 6 — Minor Modification Permit Application $6,868.56 <br />TOTAL $39,783.73 <br />Geosyntec will not exceed the cost estimate without prior approval and written authorization <br />from SWDD. <br />FL9363-01/ J1.23067 Seement 3 Cell 3 Site Preparation Amendment I.doc <br />i•Itf;3 ei1:^1'7-x,I SL'. entisis 11CI11ovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.