My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-269
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:28:30 PM
Creation date
1/9/2024 1:26:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/1999
Control Number
1999-269
Entity Name
Glace & Radcliffe, Inc.
Subject
Contact and Revised Proposal for Solid Waste Master Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Task 6.0 Evaluation of Existing Facilities and Operations <br />This section of the Master Alan will develop individual solid waste system efficiency <br />based upon facility capacity, permitting issues and ability to expand. Recommendations <br />for specific solid waste system processes to evaluate in the subsequent alternative tasks <br />will be provided. <br />Subtask 6.1 Operational Evaluation <br />G&R will summarise the current existing facilities for SWDD. Capacity potential turd <br />ability to expand each operation will be determined and compared with actual usage of <br />the facility. This evaluation will included review of the facilities based upon current <br />environmental regulations. Staffing levels of each solid waste operation will be <br />determined for subsequent analysis. <br />All facilities will be inspected to also determine any necessary improvements to bring the <br />facilities up to standards in the industry. <br />Subtask 6.2 Unit Operation Breakdown <br />G&R will develop a unit cost for each separate operation of the solid wast: system. The <br />Class I, C&D, yard waste, and recycling operations costs will be calculated separately to <br />develop a cost of processing per ton of material at the IRC landfill. Operational costs will <br />be developed for collections, recycling and disposal where feasible <br />Subtask 6.3 Task 6 Technical Memorandum <br />G&R will present for County review a technical memorandum specifying solid waste <br />management units that should be evaluated further in the alternative analysis tasks. The <br />unit costs developed in subtask 6.2 will be compared to other east Central Florida solid <br />waste system operations using Brevard, Lake, Orange, Seminole and St. Cloud. recent <br />bid proposals to transport and dispose of solid waste out of local government jurisrlic.tin;is <br />by private operators will also be presented for comparison purposes. Solid waste <br />operations with high unit costs, capacity, andlor environmental issues at IRC will be <br />identified for further evaluation in subsequent sections. <br />Task 7.0 Leachate Management Alternatives <br />Subtask 7.1 Leachate Characterization and Quantity Projection <br />G&R will summarize leachate generation and quality data from the County's lined <br />landfill cell. As part of this analysis G&R will review past leachate generation <br />calculations to compare actual leachate flows versus estimates. G&R will develop a <br />FIELD model to estimate leachate quantities on an average and peak basis from Segment <br />2, future operation of the infill segment, and the build out of the landfill site. Help model <br />options will also be developed in consideration of the bioreactor landfill systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.