Task 11.0 Evaluation of Alternative Solid Waste Management System Concepts <br />The G&R project team will review the Tasks 3 through 10 analysis with IRC staff to <br />reduce to the most feasible options for IRC. In particular the discussion will center on <br />areas in the operation that was shown to be more costly on a unit basis than other <br />operations in cast central Florida. <br />Subtask 11.1 Summary Evaluation <br />The results of Tasks 3, 4, S, ti, 7, 9,10 and 12 will be presented in detail with a ranking of <br />alternatives developed within the tasks. This summary will detail the potential for savings <br />to the SWDD for implementing such systems or maintaining current management <br />practices. "Noncost" alternatives such as modifications to ordinances and agreements will <br />also be discussed. This summary will be presented to the County for comment and <br />finalizing the ranking of alternatives. <br />Subtask 11.2 Solid Waste Alternatives Summary Memorandum <br />G&R will present a summary technical memorandum detailing the final ranking of <br />alternatives with a proposed series of recommendations regarding implementing the <br />highest ranked alternatives. This memorandum will be used its the basis for finalizing the <br />Master Plan through subsequent tasks. <br />Task 12.0 Existing Site Build -Glut Plan and Future Site Considerations <br />G&R's will develop the following three alternative build out options for the site based <br />y� upon the solid waste projections developed in Task 3.0: <br />1 • Revised build out based upon the 1994 plan (Base Option) <br />+ Build out maximizing the site using infill between cells where feasible <br />• Build out plan assuming implementation of highest ranked alternative <br />management options <br />Specific issues, regarding buildout of the site, will be addressed by G&R in this task are <br />as follows: <br />• Currently, all Borrow for Glass I and C&O cover is purchased offsite and <br />trucked directly to landfill [alit. No borrow is available on the original site <br />except for the minor stormwater changes to the on-site ponds. The Master <br />Plan will include borrow plan if landfilling operations continue onsite. <br />• The infill will provide capacity through late 2002. <br />13 <br />