Laserfiche WebLink
01 <br />0 <br />Schedule <br />The enclosed chart provides a summary of the schedule to complete the Master Plan by <br />Task. From receipt of authorization, the anticipated time to complete the draft Solid <br />Waste Master Platt document is 170 days. <br />Subconsultants <br />The following subconsultants will be utilized by G&R during the course of preparing the <br />Master flan. Each consultants responsibility or area of expertise is also listed. <br />Subconsultant Specialty <br />Ardaman and Associates Soil Boring and Geotechnical <br />TIA Waste Composition Studies and Recycling Markets <br />Debra Reinhardt PhD,PE Bioreactor Design <br />Lotspeich & Associates Environmental Assessments <br />Government financial Advisors Inc CIP Financing <br />Malcolm Pimie, Inc. Waste -to -Energy Analysis <br />Compensation <br />Compensation to G&R will be pursuant to the Contract terms and conditions. <br />Compensation to G&R will be on a salary cost basis with an tipper limit $299,674 far <br />Tasks I through 16 as provided in 'Cables I thru 4 in attachment B. Any work required <br />under Task 17 will be negotiated at a later date. <br />17 <br />