My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-269
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:28:30 PM
Creation date
1/9/2024 1:26:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/1999
Control Number
1999-269
Entity Name
Glace & Radcliffe, Inc.
Subject
Contact and Revised Proposal for Solid Waste Master Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule <br />I'he enclosed chart provides a summary of the schedule to complete the Master Plan by <br />"Task. From receipt of authorization, the anticipated time to complete the draft Solid <br />Waste Master Plan document is 170 days. <br />In the event the waste composition studies cannot be schedule to obtain both low and <br />high population seasons in the summer of 1999 acid winter of 199912000, the schedule <br />may need to be modified with County agreement. <br />Subconsultants <br />The following subconsultants will be utilized by G&R during the course of preparing the <br />Master Plan. Each consultants responsibility or area of expertise is also listed. <br />Subconsultant Specialty <br />Ardaman and Associates Soil Boring and Geotechnical <br />TIA Waste Composition Studies and Recycling Markets <br />Debra Rcinhardt PhD,PE Bioreactor Design <br />Lotspeich & Associates Environmental Assessments <br />Government Financial Advisors Inc CIP Financing <br />Malcolm Picnic, Inc. Waste-lo-Encrgy Analysis <br />Compensation <br />Compensation to G&R will be pursuant to the Contract terms and conditions. <br />Compensation to G&R will be on a salary cost basis with an upper limit $299,674 for <br />'tasks I through 16 as provided in Tables Ithru 4 in attachment 13. Any work required <br />under "risk 17 will be negotiated at a later date. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.