My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-269
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:28:30 PM
Creation date
1/9/2024 1:26:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/1999
Control Number
1999-269
Entity Name
Glace & Radcliffe, Inc.
Subject
Contact and Revised Proposal for Solid Waste Master Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br />ATTACHMENT <br />PROJECT i�UPGEF <br />INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT <br />Enginearing Services for Solid Waste Master Plan <br />Project: Solid Wade Master Plan <br />Des.Gnptlon: Task 1.0 Project Initiation <br />Task 2.0 Project Quality Management <br />Task 3.0 Population and Solid Waste Projections <br />Task 4.0 We ale Compos itionAnalysis <br />Task 5.0 Review of Solid Waste OrdinanceslAgreements Related to Collection Processing and Disposal <br />Task 6.0 Evaluation of Existing Facd"s. and Operallon <br />Task 7,0 Leachate Managemernl Altemalives <br />Task 8 0 Recoverable Materials Market Survey <br />Task 9.0 RecydingFMalerisl Recovery Program Evaluations <br />Task 10.0 Solid Waste Processing and Disposal Technology <br />Task 11.6 Evaluation of ARemative Solid Waste Management 5ystam Concepts <br />Task 12.0 Existing Site Burfd•Out Plan and Future Site Considerations <br />Task 13.0 Revenue Generation <br />Task 14.0 Recommendation Summary and Detailed Implementation Plan and Schedule <br />Task 15.0 Report Preparation <br />Task 16.0 Meetings <br />Task 17.0 Additional Services <br />Reference Contract Agreement Between Indian River Counly BCC and Glace and Raddilde <br />1A-gLQCa1rggo_,r}t <br />Hours <br />Y9141 <br />Project Director <br />315 <br />Projecl Manager <br />553 <br />Project Engineer <br />870 <br />CAD Tect1 <br />250 <br />Clerical Support <br />126 <br />TOTAL HOURS <br />2122 <br />Direct Salary Cost <br />$60,941 <br />Indirect Salary Cosl @0.3752 <br />$22,865 <br />SALARY COST <br />$83.006 <br />Salary Times Multiplier @ 2.1815 <br />$102,823 <br />Other Direct Costs <br />Travel <br />$1,528 <br />C ampule r Servi cc s <br />$8,116 <br />Fax, postage atc <br />$550 <br />Panting <br />51,225 <br />Subconsullanls <br />$105.433 <br />TOTAL ESTIMATED FLE <br />$249,674 <br />
The URL can be used to link to this page
Your browser does not support the video tag.