Laserfiche WebLink
• <br />0 <br />Contract #ISD509AA <br />Estimated Cost: The design is estimated to cost $27,004.00 <br />Estimated Schedule: Start November 1999, finish December 1999 <br />Deliverables: A complete survey of the property. <br />Task 2: Pre -Construction [Monitoring & Engineering design <br />Description: COUNTY's engineering consultant will prepare detailed design specifications and <br />construction documents for the stormwater detention ponds. Pre -construction surface water <br />monitoring will be conducted to assess nonpoint source pollutant loading rates from the <br />subdivision. (Post construction surface water monitoring will be conducted over a l+ year time <br />frame, see Task 8 below.) <br />Expected Results: A complete, efficient and cost effective design. <br />Estimated Cast: The design is estimated to cast $27,130,00 (See costs listed in Task 5 for surface <br />water monitoring.) <br />Estimated Schedule: Start December 1999, finish April 2000 <br />Deliverables: A pre -construction water quality monitoring; plan. A complete set of design and <br />construction drawings and speelfications. Pre -construction water quality monitoring data. <br />Task 3 and 4: Prepare, Send, Receive, Evaluate ,and Award Construction Bid. <br />Description: COUNTY will prepare, advertise for, send, receive, and evaluate bids for <br />construction of the two major pond systems at the Vero Lakes Estates project sites. An award <br />will be made, contracts signed, and notice to proceed given. If needed, a separate notice to <br />proceed for the stormwater detention facilities will be postponed until any required grant funding; <br />is received. The design of these ponds allows the construction of these stormwater facilities to <br />occur anytime after July 1, 200[1, <br />Ex aected Results: A number of received competitive bids will be evaluated, a responsible low <br />bid that is within budget will he selected. <br />Estimated Cost: Administration of the bid process for the stormwater treatment ponds is <br />estimated to cost $5,000.00 <br />Estimated Schedule: Start April 2000, finish June 2000 <br />Deliverables: A construction contract with a notice to proceed given to the most responsive low <br />bid. <br />Task 5: Construction of Stormwater Detention Pond Facilities <br />Description: COUF`TY's selected contractor will construct the stormwater treatment systems <br />designed under Task 2. <br />Page 13 of 28 <br />