Laserfiche WebLink
• <br />Contract #SD609AA <br />Deliver ablcs: Monthly Update Reports. The acceptance of the facilities as completed according <br />to design. <br />Task 6: Construction of Luke Control 'Structures for Water Quality Treatment & Erosion <br />Control <br />Isxpeeted Rcstilt s: Installation of take control structures at the two major pond systems, <br />Deliverables: Monthly Update Reports. 'Five pond structures in the two stormwater treatment <br />facilities. <br />Task T: Ditch Excavation <br />Expected Results: Both Canal A and Canal B will receive reshaping and 3,200 linear feet of <br />cleaning. The 804 Street Canal near the Oak Lake Area will be constructed as a 2,000 linear feet <br />facility with two canal crossing structures (pipe structures with cadwalls). The $o`" Street Canal <br />near the Lake 20 Area will be constructed as a 2,0ot1 linear feet facility with two canal crossing <br />structures. <br />Deliverables: Monthly Update Reports. Completion of construction and reshaping, of canals, and <br />construction of canal crossings. <br />Task 8: Implementation of Surface Water Monitoring Program <br />E,xxl»ctedResults: A regular surface water monitoring program will be implemented at the <br />project site. Regular review of results will guide operation of the stormwater trcatment ponds as <br />needed. <br />Deliverables: Pre and Post Construction Monitoring Plans, Monthly pre -construction water <br />duality base line sampling results. Bi -monthly post -construction stormwater reports, storm event <br />grab sample reports, and bi-annual stormwatcr analysis reports. <br />Task 9: Implementation of Education Component <br />Expected Results: FYN workshops and FYN Yard Certification. <br />Deliverables: Deliverables will include the total number of persons attending FYN workshops, <br />the total number of certified yards, and the identified percentage of the residents that adopt FYN <br />BMPs. Yard BMP adoptions will be measurcd by IFAS evaluation instruments already <br />developed. A final education report conveying the IFAS evaluation results and deliverables will <br />be provided to COUNTY for incorporation into the final 319 project report. <br />Task 10; Draft and final Reports <br />Page 17 of 28 <br />