My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-277
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:54:55 PM
Creation date
1/9/2024 1:53:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/02/1999
Control Number
1999-277
Entity Name
St Johns River Water Management District
Subject
Vero Lake Estates Stormwater System Retrofit and Wabasso Causeway Park Improvements Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Contract #SD609AA <br />Deliver ablcs: Monthly Update Reports. The acceptance of the facilities as completed according <br />to design. <br />Task 6: Construction of Luke Control 'Structures for Water Quality Treatment & Erosion <br />Control <br />Isxpeeted Rcstilt s: Installation of take control structures at the two major pond systems, <br />Deliverables: Monthly Update Reports. 'Five pond structures in the two stormwater treatment <br />facilities. <br />Task T: Ditch Excavation <br />Expected Results: Both Canal A and Canal B will receive reshaping and 3,200 linear feet of <br />cleaning. The 804 Street Canal near the Oak Lake Area will be constructed as a 2,000 linear feet <br />facility with two canal crossing structures (pipe structures with cadwalls). The $o`" Street Canal <br />near the Lake 20 Area will be constructed as a 2,0ot1 linear feet facility with two canal crossing <br />structures. <br />Deliverables: Monthly Update Reports. Completion of construction and reshaping, of canals, and <br />construction of canal crossings. <br />Task 8: Implementation of Surface Water Monitoring Program <br />E,xxl»ctedResults: A regular surface water monitoring program will be implemented at the <br />project site. Regular review of results will guide operation of the stormwater trcatment ponds as <br />needed. <br />Deliverables: Pre and Post Construction Monitoring Plans, Monthly pre -construction water <br />duality base line sampling results. Bi -monthly post -construction stormwater reports, storm event <br />grab sample reports, and bi-annual stormwatcr analysis reports. <br />Task 9: Implementation of Education Component <br />Expected Results: FYN workshops and FYN Yard Certification. <br />Deliverables: Deliverables will include the total number of persons attending FYN workshops, <br />the total number of certified yards, and the identified percentage of the residents that adopt FYN <br />BMPs. Yard BMP adoptions will be measurcd by IFAS evaluation instruments already <br />developed. A final education report conveying the IFAS evaluation results and deliverables will <br />be provided to COUNTY for incorporation into the final 319 project report. <br />Task 10; Draft and final Reports <br />Page 17 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.