My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-277
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:54:55 PM
Creation date
1/9/2024 1:53:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/02/1999
Control Number
1999-277
Entity Name
St Johns River Water Management District
Subject
Vero Lake Estates Stormwater System Retrofit and Wabasso Causeway Park Improvements Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract #SD609AA <br />upon the project's completion. This report may be included as a portion of the final project <br />report, or as a separate document. <br />All laboratory analyse~ will be performed in accordance with EPA and FDEP approved <br />protocols. The selected firm will maintain a FDEP approved Comprehensive Quality Assurance <br />Plan and Florida Department of Health certification. <br />• Lead Agency: Selected firm through the bidding process <br />• Prcquency of Testing Locations for Base Flow: Surface water, monthly; Discharge, varied <br />times over a 12 -month period. <br />• Frequency of Testing for Storm Events: Surface Water and Discharge, via hand -sampling or <br />automated equipment. <br />• plumber of Testing Locations: Surface water, two; Discharge, four; Storm -event samplers, <br />two, <br />• Testing Parameters: Canal surface water <br />Temperature, bottom of water column (bottom) <br />pH, bottom <br />Salinity, bottom <br />Dissolved Oxygen, bottom <br />Temperature, surface of water column (surface) <br />pH, surface <br />Salinity, surface <br />Dissolved Oxygen, surface <br />Discharge Velocity <br />Flow <br />Surface Water Elevation <br />Total Kjeldahl Nitrogen (TKN) <br />Nitrate and Nitratc-N <br />Ammonia -N <br />Total Phosphorus <br />Color <br />Biological Oxygen Demand (BOD) <br />Total Suspended Solids (TSS) <br />Alkalinity <br />Fecal Coliforms. <br />Reporting: <br />A component of this project involves developing a detailed and systematic record-keeping; <br />system to monitor maintenance activities on each BMP element. Logs will be kept detailing <br />equipment and procedures used in maintaining/cleaning and operating the respective <br />BMPs/controls. A systematic evaluation will be incorporated into the Water Quality Monitoring <br />Plan to gauge the overall effect of the full set of BMP improvements on both the quality of water <br />discharged through the various outfalls and the water quality of the Vero Lakes Estates project <br />area. Water samples from the outfalls will be periodically collected, tested and analyzed to <br />develop trend curves. It is estimated that bi-monthly and bi-annual review reports will be <br />produced. <br />Page 20 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.