My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-277
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 1:54:55 PM
Creation date
1/9/2024 1:53:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/02/1999
Control Number
1999-277
Entity Name
St Johns River Water Management District
Subject
Vero Lake Estates Stormwater System Retrofit and Wabasso Causeway Park Improvements Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do <br />Contract #SD609AA <br />COUNTY's contractor will be responsible to install and maintain erosion and sedimentation <br />controls in accordance with DISTRICT and COUNTY requirements. Erosion control shall <br />consist of placement of hay hales and/or turbidity barriers on the down slope of disturbed areas at <br />points of concentrated runoff. Floating turbidity barriers will be installed prior to commencing <br />shoreline stabilization work, and remain until [lie backfill is in place and vegetated. <br />The proposed riprap revetment grade will be a 2:1 slope. Filter cloth shall be placed with long <br />dimension perpendicular to the embankment, with a minimum 36' overlap at each joint. The <br />filter fabric will be trenched in at the top of bank and trenched in at the toe of the slope. A 6" <br />layer of 2"-6" size coquina or washed angular rock bedding stone will overlay the filter cloth. <br />Armor stone of 16"-18" size coquina (or other approved by the engiricer) with a minimum unit <br />weight of 125 PCF shall be placed in such a manner that they will be properly interlocked with <br />the underlying or adjacent stones to resist displacement by wave action and to form a uniform <br />and compact section. Each stone shall be firmly set and well supported by underlying or <br />adjacent stone. Head sized rock and "chink" rock shall be placed within the interstices of armor <br />stones. No head size or smaller stones may be free on the surface. <br />A mid -project and final project report will be prepared and submitted for review and comment to <br />DISTRICT's Project Manager. The raid -project report (May 2000) will provide the current <br />project status and percentage of project complete. The final project report (September 2000) will <br />include the completion date of the project and describe any significant deviations from the <br />proposed project scope and/or construction details. <br />III. PROJECT TIMELINE <br />DISTRIC ['s Governing Board Approval ................................................... November 10, 1999 <br />Execute Agreement..................................................................................... November 24, 1999 <br />Advertise for Bids..........................................................................................December 6. 1999 <br />Receive and Open Bids....................................................................................January 12, 2000 <br />Award Construction Contract...........................................................................February 8, 2000 <br />Begin Construction.............................................................................................March <br />10, 2000 <br />Mid -Project Report................................................................................................May <br />20, 2000 <br />Complete Construction............................................................................................ <br />July 8, 20 X) <br />Certificate of Occupancy ...................................................................................August <br />21, 2000 <br />Final Payment to Contractor........................................................................ <br />September 15, 2000 <br />Final Project Report & Reimbursement from DISTRICT .......................... <br />September 25, 2000 <br />Warranty Inspection................................................................................................ <br />July 8, 2001 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.