My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-287
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 2:10:06 PM
Creation date
1/12/2024 12:27:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
11/16/1999
Control Number
1999-287
Subject
Final Draft for Sebastian Area-Wide FL Scrub-Jay Habitat Conservation Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is labor intensive and requires negotiating heavy equipment. In addition, the long- <br />term effects of mechanical management actions to the scrub plant community are <br />not fully understood and must be used carefully (Schmalzer et a/. 1999). Even more <br />significant, per acre management costs for maintaining or restoring remnant scrub <br />in suburban areas, are comparatively more expensive than habitat management <br />prescriptions on large parcels of land in undeveloped scenarios. <br />In consideration of the multiple project constraints and limitations listed above, and <br />at the recommendation of the Indian River County Land Acquisition Advisory <br />Cornmittee (LAAC), the IRC Board voted in September 1996 to reject the <br />acquisition of Phase II of the SSCA project. This decision halted all acquisition <br />efforts by Indian River County of the Sebastian Highlands Unit 17 platted lots <br />comprising the SSCA (Indian River County, October 17, 1996 correspondence to <br />the FWS). At the subsequent urging of the FWS, Indian River County did complete <br />the purchase of a block of 34 contiguous lots in Unit 17. The FWS stated that the <br />... 34 AGC lots, in combination with Pelican Elementary School scrub, may <br />provide enough suitable habitat to minimize the adverse effects of habitat <br />fragmentation due to losses in the remainder of Unit 17. These scrub parcels, if <br />properly managed, may be essential "stepping stones" for dispersal of scrub -jays <br />frorn and to northern Indian River County..." (FWS, November 12, 1996 <br />correspondence to Indian River County). These 34 AGC lots, referred to herein as <br />the Sebastian Highlands Scrub Conservation Area were acquired by Indian River <br />County and are included in combination with the Pelican Island Elementary School <br />scrub as part of the proposed Sebastian HCP Scrub -Jay Habitat Compensation <br />Areas located in Unit 17 of Sebastian Highlands, <br />Implementation of Alternative 3 inay have served to increase papulation persistence <br />probability of the south subpopulation, however the persistence probability of this <br />subpopulation will always be low because of the extensive fragmentation that <br />presently characterizes this area. Appropriate management of optimal scrub -jay <br />habitat conditions within the fragmented scrub lots would have been extremely <br />difficult due to the multiple rosidential homes adjoining the SSCA project area. <br />Alternative 3 was determined to be infeasible due primarily to economic: and habitat <br />management constraints imposed by present-day conditions. <br />70 <br />l <br />
The URL can be used to link to this page
Your browser does not support the video tag.