My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C> <br />C7 <br />i <br />I_. Areas which are inaccessible to a roller {such as adjacc:tt to curls, but(ers, <br />i manholes, etc.) sliall be compacted by the use of haud tamps, small vibratory <br />tampers, or other satisfactory means. <br />M. The edges of the wearing surface shall be straight, true, and cleats in all cases, <br />aucl utust meet lite approval of alae Engineer.. Should the edges of the wearing <br />surface not meet the approval of the Engineer, they shall be saw cut to a <br />Mraight, true, clean line by the Contractor at his expense. <br />02 05 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.