My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />• <br />RRPARA:EJQ., L F PR P SAL: The Bidder must fill all required blank spaces on the Bid <br />Schedule. All writing must be typed or in ink and submitted in duplicate. Only one Bid tram <br />any individual, firm, partnership or corporation, tinder the same or different names, will be <br />considered. Each proposal must have the fu:l business address of the Bidder and roust be <br />signed by him with his usual signature or by an authorized representative. <br />Any Bid submitted with escalator clauses shall be rejected, [lid Price shall remain firm for a <br />period of sixty (60) days a[ler date of submittal <br />5. W;I,:f iJQBA_)YAL QF PRQPQ5AL: A Bidder may withdraw his proposal without prejudice <br />to himself not later than the day and hour set in the Advertisement for Bids, by ,physically <br />delivering his withdrawal in writing to the Count? Administrator and after received, his <br />proposal will be returned to him unopened <br />b. A_WWItEfiti "I he contract will be awarded to the lowest responsible <br />Bidder, provided his bid is reasonable and is in the interest of the Owner to accept it The <br />bidder to whom the award is made will be notified at the earliest possible date. The Owner.. <br />however, reserves the right to reject any and all Yids and to waive any infoi-orality on Bids <br />received, whenever such rejection or waiver is in the interest of the Owner. Further, the <br />Owner reserves the right to award the Base Bid or any alternate bid as a single contract. It <br />is anticipated that all items of the Base Bid or any Alternate Bid will be included in the <br />Contract, however, the Owner fut titer reserves the right to include only the number of items <br />in the Contract for which funds may be available The Contract Documents will be sent it) the <br />Successful Bidder for his execution The Bidder shall execute the Agreement and submit all <br />bonds and insurance certificates as set out in the Contract <br />Should the Bidder to whotm the Contract has been awarded refuse or fail to complete the <br />requirements above within twenty (20) calendar days atter Notice of Award, the additional <br />time in calendar days required to S RKELTLTi..Y complete the documents will be deducted, <br />in equal amount, from the Contract Time, or the County may elect to revoke the Award. The <br />Bid Bond of any Bidder failing to execute the awarded Contract shall be held by the County <br />for consequential damages incurred, and the Contract awarded as the Commission desires. <br />EXAMINATION OF SITE. PLANS, SPECIFICATIONS & REQJfLATt, kX-RERINI'a <br />1 he Biddcr is required, before submitting his proposal, to visit the site of the proposed work <br />and familiarize himself with the nature and the extent of the work and any surface and <br />subsurface conditions that may in any manner affect the wort: to be done, and the equipment, <br />materials, and labor required, and tine cost thereof Bidder is also required to examine <br />carefully the Plaits, Specifications, Contract Documents, including the Itegulatory Permits and <br />to inform himself thoroughly regarding any and all conditions and requirements that may in any <br />manner affect the work to be performed under the Contract. Ignorance on the part of the <br />Contractor will in no way relieve him of the obligations and responsibilities assumed under the <br />Contract. No information derived from Wraps, drawings, specifications, or from the Engineer, <br />or his assistants, shall relicve the Contractor front any risk or frottn fulfilling all tti its of the <br />Contract. <br />GC -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.