My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />0 <br />C. owner will pay for testing except tests which indicated <br />failure, in which case that test and all costs incurred <br />as a result thereof shall be paid for by the Contractor. <br />D. Standard slump tests shall be taken of the concrete <br />sample for each strength test and whenever consistency of <br />concrete appears to vary, The maximum slump of concrete <br />shall be 5 1/2" unless specifically otherwise noted. <br />E. Concrete that fails by test shall be replaced at no cost <br />to Owner. <br />F. Test for strength shall be made as follows: <br />1. one set of five cylinders shall be made for every 50 <br />cubic yards of concrete or portion thereof placed per <br />day. <br />2. Samples for test shall be taken at 1/4 and 3/4 points <br />of the load in mixer. <br />3. Test one cylinder at 3 days, one at 7 days, and 2 <br />cylinders at 28 days. Hold one cylinder for future <br />use if test does not comply at 2B days. <br />4. If necessary, comply with Architect's request for <br />additional cylinders, slump or load test. <br />I7'lsyMA.C'��]!lll+. M <br />2.01 CONCIOTE <br />A. Cemcnt shall be Portland cement, ASTM C-150. <br />B. Aggregates for normal weight concrete shall meet the <br />requirements of ASTM C-33. <br />C. Mixing water for concrete shall be potable and meet the <br />requirements of ASTM C-94, <br />2.02 ACCESSORIES <br />A. Anchor slots, reglets and inserts of type, size and <br />anarrvi n� —Ra.e_.—d by trades invol • ed, tis:d oho..n o.. plans. <br />B. Vapor Barrier: .006 "Visqueen", Polyethylene Film. <br />C. Chemical Curing Compound: Application of a curing <br />compound shall be made to all slabs and such application <br />shall conform to ASTM C-309. The compound shall be <br />applied in accordance with the recommendations of the <br />manufacturer immediately after any water sheen wh:'ch may <br />develop after finishing has disappeared from the concrete <br />surface. It shall not be used on any surface against <br />which additional concrete or other material is to be <br />bonded unless it is provers that the curing compound will <br />not prevent bond, or unless positive measures are taken <br />to remove it completely from areas to received bonded <br />applications. <br />03300-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.