Laserfiche WebLink
40 <br />11 <br />f )]NISI❑N 7, THERMAL & MOISTURE PRQU9TICfI� <br />SECTION 07190 - VAPOR BARRIER <br />F PART 1 - GENERAL <br />RELATED WORK EOUNI] IN OTHER SECTIONS <br />Soil conditions under vapor barrier - Section 02200 <br />Concrete - Section 03010 <br />PART 2 PRODUCTS <br />Varpor Barrier. 6 Mil Po''-thylene film. <br />Tape: As recommended by manufacturer of vapor barrier. <br />PART 3 :- EXECUTION <br />1-N3TALLATION, Apply vapor barrier over entire area to receive <br />slab; lap edges 12 inches and seal with tape. Turn edges up <br />to top of slab or down to bottom of footings. Where <br />expansion joints are indicated at adjacent vertical surfaces, <br />extend vapor barrier beyond expansion joint filler and turn <br />up to top of slab. Where expansion joints are indicated <br />within the slab, lay vapor barrier continuous under expansion <br />joint filler. <br />PROT7;CTIQN; Protect vapor barrier from damage. Repair <br />punctures and tears using patches of the material which <br />overlaps a minimum of 12 inches. Seal with tape. <br />**FEND OF SECTION*** <br />07190-1 <br />