My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />r 2.05 THRESHOLD, WEATHERSTRIP <br />A. Thresholds _And Weatherstripri.ng shall be PEMKO, to match the <br />types and sizes indicated on the Hardware Schedule or de- <br />tailed on the drawings. <br />B. Provide screws and anchors as required. <br />C. Finish to be per Schedule. <br />2.06 PLACEMENT OF HARDWARE <br />Various items shall have the following heights and locations, <br />unless otherwise indicated (Heights are shown from finish <br />floor to center line of item): <br />A. Hinges. ...........Standard Placement <br />S. Cylindrical. Lockset........ 3811 <br />C. Closer per manufacturer template to give maximum degree <br />of opening. All closers to be mounted on room side of <br />door. <br />D. Stops <br />1. Wali: on wail where knob or pull hits. <br />2. Floor: as per standard practice. <br />3. Chain Door: as per standard pracL'ice. <br />4. Over -Head: per manufacturer template to give maximum <br />degree of opening. All Over -Head stops to be mounted <br />on room side of door. <br />PART IIT EXECUTION <br />3.01 KEYING <br />A. All locks shall be construction -master keyed, grandmaster <br />keyed, and master keyed at the factory. <br />B. Submit keying schedule, based on the instructions and prior <br />approval of the Owner's representative, for final approval <br />before ordering locks. <br />C. Delivery <br />I. All locks are to be delivered to the job site with -out <br />the permanent key. All locks are to be keyed to the <br />.=:iirat iilc� Owixec' a master key, if required. <br />2. A representative of the Hardware Supplier, upon the <br />completion of the project, shall check all locks for <br />proper location, operation and keying as well as deacti- <br />vate the construction -key operation and transfer all <br />locks to a permanent key operation. <br />3. All permanent keys shall be properly identified and tag- <br />ged with a code number and location and shall be turned <br />over directly to the Owner's representative. <br />i <br />08700-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.