My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4W <br />11 <br />4. Furnish three (3) construction -master keys to the Con- <br />tractor. Furnish six (5} master keys of each set to the <br />Owner. <br />r <br />3.02 DESCRIPTION OF IiARDWARE GROUP NUMBERS <br />The following Hardware Schedule is to be used as a general <br />guide. Special or unusual conditions not covered in the <br />schedule will have hardware of a similar type and quality to <br />meet the jab conditions, and it shall be the hardware consul- <br />tant's responsibility to insure that all hardware is supplied <br />to meet job requirements and produce a complete job. <br />GENERAL NOTES: <br />1. Hardware listed taken from the fallowing catalogs. <br />HAGER Butts <br />SCHLAGE, BEST, SIMPLEX., & ADAMS RITE Locks <br />LCN Closers <br />GLYNN JOHNSON Stops <br />PEMKO 'Thresholds & <br />Weatherstripping <br />***ENI? OF SECTION*** <br />08700-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.