My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISIO 10SPECIALTIES <br />"CTI 4N 1Q155 Z- SOLA} PLASTIC TOILET PARTITIONS <br />PART 1 - GENERAL <br />1.01 RFLhTED DOCUMENTS <br />r ' <br />Drawinas and general provisions of Contract, including <br />General and Supplementary Conditions and Division -1 <br />Specification sections, apply to work of this section. <br />1.02 SUMMARY <br />xtent of toilet partitions as indicated on drawings. <br />Typfts of toilet compartments include: Solid plastic <br />homogenous color. <br />Styles of toilet compartments include; Floor --anchored, <br />overhead braced. <br />Styles of screens include: Floor -anchored. <br />Toilet accessories, such as toilet paper holders, grab <br />bars, are specified elsewhere in Division 10. <br />1.03 SUBMITTALS <br />A. Product Data: Submit manufacturer's detailed <br />technical data for materials, fabrication, and <br />installation, including catalog cuts of anchors, <br />hardware, fastenings, and accessories. <br />B. Shop Drawings: Submit shop drawings for fabrication <br />and erection of toilet partition assemblies not fully <br />described by product drawings, templates, and <br />instructions for installation of anchorage devices <br />built into other work. <br />C. Samples: Submit full range of color samples for each <br />type of unit required. Submit 6" square samples of <br />each color and finish on same substrate to be used in <br />work, for color verification after selections have <br />heel! mcLd(-. <br />1.44 4UALIT ASSURANCE <br />A. Field Measurements: Take field measurements prior to <br />preparation of shop drawings and fabrication where <br />possible, to ensure proper fillings of work. <br />However, allow for adjustments within specified <br />tolerances where ever taking of field measurements <br />before fabrication might delay work. <br />B. Coordination: Furnish inserts and anchorages which <br />must be build into other work for installation of <br />toilet partitions and related work; coordinate <br />delivery with other work to avoid delay. <br />10155-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.