My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />6 <br />I <br />May 25, 1999 <br />I. . <br />MOBILIZATION <br />The work specified in this section shall conform to Section 101 of the Latest Edition of the Florida <br />Department of Transportation Standard Specifications for Road and Bridge Construction. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Mobilization Lump Sum <br />EROSION AND WATER EOUXTI N CONTROL <br />The Contractor shall install erosion and water ,pollution control methods in accordance with FDOT Index <br />100, 102, 103 and 104, Standard Specifications Section 104, and all permit requirements. The Contractor <br />is responsible for meeting appropriate federal, state, and local regulations and water quality standards, such <br />as turbidity. All disturbed areas will be replanted with approved vegetation cover (either anal or temporary) <br />within 30 days of final grading. <br />1. Preconstruction Conference: At the preconstntction conference the Contractor shall present, in <br />written form, his plans and schedules for prevention, control, and abatement of erosion and water <br />Pollution. <br />2. flitches, Streams and Canals: Staked and floating turbidity barriers shall be installed in all permanent <br />water course in a manner so as not to act as a damn. Barriers shall be located at distance of no <br />greater than 25 feet downstream from the last point of construction. <br />3. Silt Fences. Silt fences shall be installed to prevent silt and erosion from leaving the project limits <br />particularly adjacent to wetlands, roadside ditches or existing bodies of water. <br />4. Storm Sewer Sy.tem• The C owrac!or sh:111 protect the Storm Spore; eve en: fr:;n. errs", ~d <br />sedimentation during construction. This may include the use of baled hay, silt fences or any other <br />method approved by the ENGINEER. All such costs associated with this shall be included in the <br />unit cost of storm sewer system. Should any constructed item be damaged due to erosion or <br />sedimentation, the Contractor shall repair or- replace the item with no additional compensation. All <br />new and existing (where called for) storm sewer pipes shall be clean and free from silt prior to final <br />acceptance. <br />The Contractor shall maintain stormwater runoff during construction so that flooding dues not occur. <br />Tile Indian River Farms Water Control District has jurisdiction of the Oslo Road Sub -Lateral B -7-E <br />Canal. The Contractor shall coordinate the work with the County. <br />SP -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.