My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 25, 1999 <br />The Contractor shall be responsible for performing daily inspections, including weekends and <br />holidays, with some inspections at nighttime, of the installations on the project and replace all <br />equipment and devices not conforming with the approved standards during that inspection. The <br />project personnel will be advised of the schedule of these inspections and be given the opportunity <br />to join in the inspection as is deemed necessary. <br />TRAFFIC CONTROL - STANDARDS: The Latest Edition of the FDOT _Roadway and Traffic <br />Design Standards, set forth the basic principles and prescribes minimum standards to be followed in <br />the design, application, installation, maintenance and removal of all traffic control devices and all <br />warning devices and barriers which are necessary to protect the public and workmen from hazards <br />'s'4f tin the project limits. The standards established in the aforementioned manual constitute the <br />minimum requirements for normal conditions, and additional traffic control devices warning devices, <br />barriers or other safety devices will be required where unusual, complex or particularly hazardous <br />conditions exist. <br />The above referenced standards were developed using F.H,W.A., U.S.D.O.T. Manual on Uniform <br />Traffic Control Devices O UTCD). <br />TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br />INSTALLATION: The responsibility for installation and maintenance of adequate traffic control <br />devices, wanting devices and barriers, for the protection of the travel in public and workmen, as well <br />as to safeguard the work area in general shall rest with the Contractor. Consideration shall be given <br />to recommendations of the Engineer. The required traffic control devices, warning devices and <br />barriers shall be erected by the Contractor prior to creation of any hazardous condition and in <br />conjunction with any necessary re-routing of traffic, The Contractor shall immediately remove, turn <br />or cover any devices or barriers which do not apply to existing conditions. All traffic control devices <br />shall conform to MUTCD standards and shall be clean and relatively undamaged, Damaged devices <br />diminishing legibility and recognition, during either night or day conditions, are not acceptable for <br />use. <br />NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a manner that <br />no undue hazard will result due to the requirements of this article, and the procedures and policies <br />described therein shall in no way act as a waiver of any of the terms of the liability of the Contractor <br />or his surety. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Maintenance of Traffic Lump Sum <br />SP -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.