My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 29, 1999 <br />STABILIZATIN - TYPE `C' (6" SUBGRADE) <br />Contractor shall include a unit price for subgrade preparation. The ENGINEER'S sole discretion will <br />determine the location of subgrade preparation used in the Project. <br />The work specified in this item shall conform to Section 160 of the Florida Department of Transportation <br />Specifications for Road and Bridge Construction (Latest Edition) as modified herein. No base will be <br />constructed until density tests, as directed by the ENGINEER, show the specified values have been attained. <br />The subgrade shall be stabilized to the depth shown in the plans and/or itemized proposal. <br />Item of Payment <br />Payment for the work specified in this itern shall be made under; <br />Stabilized sub -grade (6") Square Yard <br />LIMEROCK BASE COURSE <br />Article 200-10 Calculations for average thickness of base. Delete this article in its entirety. <br />Article 200-11 Method of Measurement. Delete the text of this article and substitute the following: <br />The calculations for Limerock Base to be paid for under this Section shall be the area in square yards of <br />Limerock, Base, completed and accepted with the length to be used in the calculations being the actual length <br />measured along the surface of the base and the width of the wearing surface as called for on the plans even <br />though the base shall extend beyond the limits of the wearing surface, as specified on the Plans. The <br />thickness to be paid shall be as shown on the Typical Section in the plans. <br />Article 200-12 Basis of Payment. Delete the text of this Article and substitute the following_ <br />The quantity of Limerock Base, determined as provided above, shall be paid for at the contract price per <br />square yard for Limerock Base, completed and accepted which price and payment shall be full compensation <br />for furnishing, hauling and placing all materials, and for correcting all defective surface and deficient <br />thickness. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Limerock Base Square Yard <br />SP -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.