Laserfiche WebLink
s <br />0 <br />May 25, 1999 <br />PRIME AND TACK COAT <br />All prime and tack materials as identified in the Latest Edition of the FDOT Road and Bridge Specifications <br />and 1996 Supplement may be used. Article 300-9 Basis of Payment (Page 184) is deleted and the following <br />substituted: The quantities to be paid for under this Section shall be included in the cost of the following <br />contract items: <br />I. Prime Coat - included in "Base" Pay Item. <br />1 Tack Coat - included in "Asphaltic Concrete" Pay Item <br />3. Bituminous Material (Plant Mix) (asph. cem. 20130) - to be included in Asphaltic Concrete. <br />T'Y'PE S ASPHALTIC CONCRETE <br />The work specified in tills item shall conform to Section 331 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Type S -I Asphaltic Concrete Square Yard <br />Included in this payment will be tack coat and bituminous materials (Plant Mix). No separate payment will <br />be made for bituminous materials. <br />INLETS MANHOLES ,& JUNCTION BOXES <br />The work specified in this item shall conform to Section 425-1 of the Florida Department of Transportation <br />Standard Specifications for Road and Bridge Construction. All structures within paved areas shall be <br />equipped with grates having H-20 loading. <br />Item of Fgyment <br />Payment for the work specified in this item shall be made under: <br />Inlets Type "C" Each <br />SP -10 <br />