My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DiViSION 1. GENERAL REQUIREMENTS <br />r <br />SECTION 01010 - BUMNARY OF THE WORK <br />1.0 DEFINITIONS: Except as specifically defined otherwise, <br />the following definitions supplement definitions of the <br />Contract, General Conditions, Supplementary Conditions and <br />other general contract documents, and apply generally to the <br />work: <br />a. The term "Owner", or pronouns in place of same, where <br />used in this Project Manual shall mean Board of <br />Commissioners, Indian River County, Florida. <br />b. The term "Engineer,, where used in this Project Manual <br />shall mean The Public works Director of Indian River <br />County, Florida or his designee. <br />C. The term "Contractor" or "Contractor of Record", where <br />used in this Project Manual shall mean the Contractor to <br />whom the Contract for the work described and specified <br />herein, and shown on the accompanying Drawings, has been <br />awarded by the owner. <br />d. The term "Subcontractor", or "Prune Subcontractor$$, <br />where used in this Project Manual shall mean all other <br />contractors operating under a contractual agreement for <br />specific work on this project with the Contractor. <br />e. "Owner's Representative" shall mean that individual or <br />individuals designated to represent the Owner in <br />decisions affecting the work. The owner's Representa- <br />tive will be designated prior to begrinning of <br />construction. All correspondence with the Owner's <br />representative shall be in writing and submitted through <br />the Engineer. <br />f. General Requirements: Provisions of Division r 1 <br />sections of these specifications. <br />Col 7nHi cated: Shown or. dravuings Dy iiUL1,.'.`3, gr-aphics or <br />schedules, or written intoother portions of contract <br />documents. Terms such as "shown", "noted", "scheduled" <br />and "specified" have same meaning as "indicated", and <br />are aced to.assist the reader in locating particular <br />information. <br />h. Directed. Re uYg anted Approved. Accepted_ etc.. Thesy <br />terms imply "by the Engineer" or the Owner's <br />Representative unless other indicated. <br />01010-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.