My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />i, Approved by nn zneer: In no case releases Contractor <br />from responsibility to fulfill requirement of the <br />Contract Documents. <br />j. Project Site: Space available to Contractor a': .location <br />of project, either exclusively or to be shared with <br />separate contractors, for performance of the work. <br />k. Furnish: Supply and deliver to project site, ready for <br />unloading, unpacking, assembly, installation, and <br />similar subsequent requirements. <br />1. Pr�olect Manual: As used in these Contract Documents <br />includes the Bidding requirements, Conditions of the <br />Contract, and the Specifications. <br />M. Product: As used in these Contract Document includes <br />materials, systems, and equipment. <br />n. Install: Operations at project site, including <br />unloading, unpacking, assembly, erection, placing, <br />anchoring, applying, working to dimension, finishing, <br />curing, protecting, cleaning and similar requirements. <br />o. Provide: Furnish and install, complete and ready for <br />intended use. <br />P. Installer: Entity (firm or person) engaged to install <br />work, by Contractor, subcontractor or sub -subcontractor. <br />Installers are required to be skilled experts in work <br />they are engaged to install. <br />q. OverlappinqZConflicting Requirements: MnEt stringent <br />requirements apply and will be enforced, unless more <br />detailed language written directly into Contract <br />Documents clearly indicates that a less stringent <br />requirement is acceptable. Where optional requirements <br />are specified in a parallel manner, option is intended <br />to be Contractor's unless otherwise indicated. <br />r. Minimum Requirements: Indicated requirements are for a <br />specific minimum acceptable level of quality/quantity, <br />as recognized in the industry, <br />S. The term 'tor equal" where used in the Project Manual <br />shall in all - cases mean approved equal as determined by <br />the County Engineer. - <br />2.0 DESCRIPTIVE SUMMARY OF THE WORK: The project consists <br />of the furnishing of all labor, materials, equipment and <br />services as required for the construction of a restroom <br />building and all other miscellaneous and incidental <br />appurtenances (as shown on the Drawings and described in <br />01010-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.