+f <br />11 <br />M <br />I SECTION 02114 _- SITE. CLEARING <br />A. The Contractor shall be responsible for site preparation <br />in accordance with the Architectural Site Plans. <br />! B. The Contractor is responsible for the stripping top soil <br />and the removal of organic debris from all areas below <br />f floor slabs and walkways. All useable fill and/or top <br />soil accumulated is to remain the property of the Owner. <br />Stock pile additional fill and owner will be responsible. <br />for its removal. <br />C. The Contractor is to excavate the subgrade to the levels <br />required for footings, slabs, walkways and paving. <br />D. The building areas shall be grade level and compacted with <br />a vibratory roller that exerts a dynamic load of no less <br />than 10 tons. An soft, yielding areas shall be excavated <br />and replaced with clean, compacted fill. Sufficient <br />passes are to be made during proofrolling to produce a <br />density of no less than 95% of the modified Proctor value <br />to a depth of two (2) feet-. A test report is required, <br />submitted to the Architect for approval, prior to the <br />placement and compaction of additional fill material and <br />any slab/footing concrete pours. <br />E. Fill material, below floor Slabs and footings and where <br />required to bring areas up to grade as indicated, shall be <br />clean, "approved", bank -run sand, installed in 12" lifts <br />and mechanically compacted to 98% of maximum bulk density <br />at the optimum moisture content as determined by AASO T- <br />164. A test report is required, submitted to the Archi- <br />tect for approval, prior to slab and footing concrete <br />pours. <br />The Contractor shall take care not to damage any existing <br />trees beyond the limits of construction and shall replace <br />any and all landscaping damaged by him, at no cost to the <br />Owner. <br />G. The Contractor shall check with the appropriate local gov- <br />erning agencies to ascertain the location of all under- <br />ground lanes and/or utilities and he shall take the neces- <br />sary precautions/care not to damage them. The Contractor <br />shall repair any and all damage to underground lines, at <br />hi's if same -wcrc located for hii�, pi:iuL Lu the <br />beginning of construction. <br />***END OF SECTION*+** <br />02110-1 <br />