My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />SECTION 02200 - EARTHWORK <br />PART 1 - GENERAL <br />(See also Work by County Forces) in General. <br />Conditions_ <br />1.01 DESCRIPTION <br />A. Work Included: <br />1. Excavation and disposal of excess material. <br />2. Filling and compaction. <br />3. Grading and fine grading. <br />4. Incidental earthwork. <br />1.02 QUALITY ASSURANCE <br />A. Requirements of Regulatory Agencies: <br />1. Comply with State and Local laws and codes in <br />disposal of trees, shrubs and other material. <br />B. Testing Agency: <br />I. The owner has retained a soils engineer who will <br />monitor construction of fills and embankments <br />and initial tests. All retests required <br />resulting from failure of the initial tests will <br />be paid for by the Contractor. <br />PART 2 - PRODUCTS <br />2.01 MATERIALS <br />A. Excavated Material: On-site, or imported as <br />necessary, material meeting the following: <br />1. Homogeneous, compactabic, gonorally granular <br />soil free of organics, and mucic. <br />2. Use of on-site material must be approved by the <br />soils engineer. <br />PART 3 - EXECUTION <br />3.01 PREPARATION <br />A. After the work of clearing and grubbing, accurately <br />perform all construction layout. <br />R. Before exravatlont <br />1. Verify layout, horizontal and vertical, and con- <br />formance of layout with Contract Drawings. <br />2. Verify Limits of Construction. <br />3. Accurately survey and record the location of <br />property monuments bench marks, USES Monuments, <br />ROW markers which may be moved by the Con- <br />tractor's operations. Use licensed land <br />surveyor only. All property monuments, ASGS <br />Monuments and ROW markers moved, shall be <br />replaced by a licenses land surveyor. <br />02200-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.