Laserfiche WebLink
171 <br />installed materials on a percentage complete basis. Invoices shall be processed monthly for the <br />percentage of work complete, with final payment and release of retainage issued at the time the <br />above referenced facilities are dedicated to and accepted by the COUNTY. <br />Reimbursement shall be in the form of check from the COUNTY, and shall not exceed the <br />amount of12S x5,600 (see attached Exhibit C-1). <br />S 74"' Avenue south of 16ih St DEVELOPER'S Water Line: <br />The DEVELOPER may furnish and install water mains south of 16-, St. along 74"' Ave. The <br />DEVELOPER shall make connection to the water line referenced under item A. above. The size <br />of the DEVELOPER'S water lanes shall be determined based on the DEVELOPER's needed fin; <br />flow and domestic water demands. no cost for the DEVELOPER'S water lines shall be home <br />entirely by the DEVELOPER. <br />16"' Strcet COUNTY MASTER PLAN Water Line_ <br />Furnish and install a 20 -inch PVC water main alone; 16th St. from 82"" Ave. to 74 Avenue and <br />from 74'h Ave. to the eastern most property line of die DEVELOPER'S property. Total footage <br />is approximately 9,200+1- linear feet. The DEVELOPER shall make connection to the water <br />lines referenced under item A and B, above. <br />Reimbursement: The COUNTY shall provide immediate one -hundred percent (1.009/0) <br />reimbursement, less too/n retainage and loss the line extension fee to the DEVELOPER based on <br />an itemized invoice of installed materials on a percentage complete basis. Invoices shall be <br />processed monthly for the percentage of worked completed, with final payment and release of <br />retainage issued at the time die above referenced facilities are dedicated to and accepted by the <br />COUNTY. <br />Line Extension Fee: The Developer shall pay line extension fees in the amount of $11,25 per foot <br />of cacti property frontage (each side of road) the COUNTY'S MASTER PLAN Water Lino. The <br />DEVELOPER'S fee for this portion is tabulated below: <br />Frontage (north) Frontage (south) <br />Total Frontage I Cost per front <br />Footage ($/ I�.) <br />Developer <br />Cost <br />2,650 4,000 <br />6650 $11.25 <br />$74,812.50 <br />Reimbursement shall be in the form of check from the COUNTY, and shall not exceed the <br />amount of $222,787.50 (see attached Exhibit C-2). <br />D. 74" Avenue to 8'h St COUNTY MASTER PLAN Wastewater Forec Main: <br />Furnish and install a 16 -inch PVC force main along 74'h Ave. Make connection to an existing <br />12 -inch force main located on 74' Ave, near the intersection of Rosewood Road (approximately <br />2,600 lineal feet south of SR -60). The new force: main shall extend south along 74' Ave. to g'" <br />St. (approximately 5,200 lineal feet). <br />Reimbursement: The COUNTY shall provide immediato one -hundred percent (100°/x,) <br />reimbursement, less 10% retainage and less the line extension fee to the DEVELOPER based on <br />an itemized invoice of installed materials ort a percentage complete basis. Invoices shall be <br />processed monthly for the percentage of worked completed, with final payment and release of <br />13eveloper's Agreement <br />Pointe West of Vero reach <br />Page 2or17 <br />C:rsuven Doyio Mstproject- Pointe west orvero ikachlpoint west of vcro reach, Dow1opers Agcement, Nov 17, 1999.doc <br />