Laserfiche WebLink
• <br />retainage issued at the time the above referenced facilities are dedicated to and accepted by the <br />COUNTY. <br />Line Extension Fee: The Developer shall pay line extension fees in the amount of $15.77 per Foot <br />of each property frontage (each side of road) oa the COUNTY'S MASTER PLAN Wastewater <br />Force Main. The DEVELOPER'S fee For this portion is tabulated below: <br />Frontage (east) <br />Frontage (west) <br />Total Frontage <br />Cost per Front <br />Footage ($1 ft.) <br />Developer <br />Cost <br />2,960 <br />2,550 <br />5450 <br />$15.77 <br />S85,946.5I1 <br />Reimbursement shall be in the form of check from the COUNTY, and shall not exceed the <br />amount of $ 188 753.50 (see attached Exhibit C-3). <br />1~. 8'3' Street COUNTY MASTER PLAN Wastewater Force Main: <br />Fumish and install a 16 -inch PVC force main along 8' St. from the intersection of 74' Ave. to <br />82"i Avenue. The DEVELOPER shall make connection to the force main referenced under item <br />D, above. This section of force main along R"' St. is approximately 5,200 +/- lineal feet in <br />length. <br />Reimbursement: Upon payment of Capacity Charges, the COUNTY shall provide immediate <br />one -hundred percent (100%) reimbursement, less 10%u retainage and less the line extension fee to <br />the DEVELOPER based on an itemized invoice of installed materials on a percentage complete <br />basis. Invoices shall be processed monthly for the percentage of worked completed, with final <br />payment and release of retainage issued at the time the above referenced facilities arc dedicated <br />to and accepted by the COUNTY. <br />Line Extension Foe: The Developer shall pay line extension fees in the amount of $15.77 per foot <br />of each property frontage (each side of road) on die COUNTY'S MASTER PLAN Wastewater <br />Force Main. The DEVELOPER'S fee for this portion is tabulated below: <br />Frontage (north) <br />Total Frontage Cost per Front Developer Cost <br />Footage ($1 ft.) <br />1,330 <br />1330 $15.77 $20,974.10 <br />Reimbursement shall be in the fort of check from the COUNTY, and shall not exceed the <br />amount of $242,925.9i? (see attached Exhibit C-4). <br />SC - 2. Amendment: <br />Only, a written instrument executed by the party or parties to be bound thereby may :upend this <br />Agreement. <br />SC - 3. Assignability: <br />Either party may assign this Agreement, however, the rights granted herein shall nun with the land <br />and arc not considered the personal property of the DEVELOPER. Therefore, while the DEVELOPER <br />has the right under this Agreement to freely transfer the rights and obligations granted by this Agreement, <br />the assignee shall not have the right to transfer these rights to another property unless this At>rcement is <br />amended in writing by the assignee and the COUNTY to provide otherwise. <br />mveloixi s Agreemeni <br />Pe ince West or Vero Nach <br />Page 3 of 17 <br />C: Steven Doyle Fitea Nuica - Pointr West of Veto Naeh%Paint West of Vero peach, Developers Agreement, Nov 17, t999.doc <br />