My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-016
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 9:28:10 AM
Creation date
1/29/2024 9:26:26 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/09/2024
Control Number
2024-016
Agenda Item Number
8.Z.
Entity Name
St. Johns River Water Management District (SJRWMD)
Subject
Cost Share Agreement Contract #38600 for South Oslo Riverfront Conservation
Area Floodplain Restoration Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />RYAN L. BUTLER, CLERK Contract #38600 <br />ATTACHMENT A —STATEMENT OF WORK <br />INDIAN RIVER COUNTY SOUTH OSLO RIVERFRONT CONSERVATION AREA <br />FLOODPLAIN RESTORATION <br />I. INTRODUCTION/BACKGROUND <br />The Fiscal Year (FY) 2021-22 Resilience Plan is to develop and implement resource and water supply <br />development projects and promote conservation. On April 11, 2023, the District's Governing Board <br />approved funding for cooperative cost -share projects. Each project selected for funding will have a positive <br />benefit to one or more of the District's core missions; including water supply, water quality, natural systems, <br />or flood mitigation. <br />Indian River County (Recipient) has been awarded funding for their Indian River County South Oslo <br />Riverfront Conservation Area Floodplain Restoration (Project) for the not to exceed amount as set forth in <br />paragraph 4(a) of the Agreement. The Recipient is located in Indian River County. <br />II. OBJECTIVES <br />The objective of this contract is to provide cost -share dollars that will enable the Recipient to remove <br />approximately 1,100 feet of perimeter dike and improve exchange between impounded mangroves and the <br />Indian River Lagoon (IRL). Restoration of a more natural hydroperiod in the impoundment will be a <br />significant benefit to wildlife species using the mangroves, and the reconnection is anticipated to provide <br />additional fisheries habitat. <br />III. SCOPE OF WORK <br />The Project is located within the 143 -acre South Oslo Riverfront Conservation Area (SORCA) abuts the 298 - <br />acre Oslo Riverfront Conservation Area. SORCA's eastern impoundment is no longer part of a Rotational <br />Impoundment Management network. Removal of approximately 1,100 feet of perimeter dike to improve <br />exchange between impounded mangroves and the IRL. <br />IV. PROJECT ADMINISTRATION AND DELIVERABLES <br />The Recipient shall be responsible for the following: <br />• Complete and obtain final project design, construction plans, and specifications; <br />• Obtain all required permits, including right of access to the project sites, related to project <br />construction and subsequent operation and maintenance of the completed work; <br />• Assure compliance with all permits and permit conditions; <br />• Provide procurement for project construction; <br />• Perform supervision and inspection of construction; <br />• Perform construction contract administration; <br />• Assure compliance with cost accounting practices and procedures required for reimbursement of <br />cost -share funds expended. <br />The Recipient shall provide the following to the District's Project Manager: <br />• Timely invoices for actual project costs in accordance with this cost -share agreement to enable <br />proper review by the District's Project Manager prior to payment authorization. Deliverables to be <br />submitted with invoices include (as applicable): <br />o Interim progress status summaries including inspections, meeting minutes and field notes <br />and dated color photographs of the construction completed to include on-going work that <br />represents the time -period being invoiced; <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.