My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-331
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 11:41:22 AM
Creation date
1/29/2024 11:41:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/21/1999
Control Number
1999-331
Entity Name
Oak Chase Development LLC
Subject
Contract for Construction Required Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />ENGINEER'S COST ESTIMATE <br />BASED ON ACTUAL CONTRACT PRICES WITH PAN AMERICAN ENGINEERING <br />OAK CHASE SUBDIVISION <br />PHASE 1 <br />12/14/99 <br />I, John H. Blum, P.E., a Florida Registered Engineer, License No. 45813, do hereby certify that a cost estimate has been <br />prepared under my responsible direction for those improvements listed below that are currently outstanding and that the <br />total cost estimated for said improvements is $604,550.00. This estimate has been prepared, in part, for the purposes of <br />establishing proper surety amounts associated with the approval by Indian River County of a final Plat for the.0ak Chase <br />Subdivision -Phase I. Please note that the dollar amounts shown below are actual contact prices between the,dev.lorper. <br />and the contractor. <br />Jo H. Blum, P.E. N45813 Date: <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT TOTAL <br />PRICE AMOUNT <br />1.00 <br />1.01 <br />1.02 <br />1.03 <br />1.04 <br />1.05 <br />1.06 <br />1.07 <br />1.08 <br />1.09 <br />1.10 <br />2.00 <br />2.01 <br />2.02 <br />2.03 <br />2.04 <br />2.05 <br />2.06 <br />2.07 <br />2.08 <br />2.09 <br />EARTHWORK <br />Mobilization <br />Clearing & Grubbing (R -O -W & Tracts) <br />Clearing & Grubbing (Lots) <br />Grading (Roadway) <br />Grading (Lots) <br />Excavation (Lakes) <br />Excavation(Swales) <br />Berm Along 33rd Street <br />Imported Fill (Includes 18% fluff) <br />Sodding <br />PAVING <br />8" Stabilized Subgrade <br />6" Limerock/Coquina Base <br />1" S -I Asphalt <br />2' Miami Curbing <br />4" Reinforced Concrete Sidewalk <br />30" High Intensity Stop Sign <br />24" Thermoplastic Stop Bar <br />Gore Striping @ Entrance <br />Pavement Open -Cut & Restoration <br />1 <br />11.2 <br />12.5 <br />15,565 <br />62,131 <br />70,527 <br />515 <br />250 <br />0 <br />22,050 <br />9,720 <br />7,875 <br />7,420 <br />5,000 <br />329 <br />5 <br />5 <br />1 <br />38 <br />L.S. <br />ACRE <br />ACRE <br />S.Y. <br />S.Y. <br />C.Y. <br />C.Y. <br />C. Y. <br />C.Y. <br />S.Y. <br />S.Y. <br />S. Y. <br />S.Y. <br />L.F. <br />S.Y. <br />EACH <br />EACH <br />L.S. <br />S.Y. <br />$1,000.00 $1,000.00 <br />$0.00 $0.00 <br />$0.00 $0.00 <br />$0.50 $7,782.50 <br />$0.35 $21,745.85 <br />$1.70 $119,895.90 <br />$2.00 $1,030.00 <br />$9.00 $2,250.00 <br />$3.90 $0.00 <br />$1.15 $25,357.50 <br />Sub -Total $179,061.75 <br />$1.70 $16,524.00 <br />$4.75 $37,406.25 <br />$3.32 $24,634.40 <br />$5.95 $29,750.00 <br />$23.00 $7,567.00 <br />$200.00 $1,000.00 <br />$125.00 $625.00 <br />$620.49 $620.49 <br />$25.00 $950.00 <br />Sub -Total $119,077.14 <br />EXHIBIT "A" <br />Page I <br />CAISu rving Florida <br />Si1t<1. 11111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.