My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-331
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2024 11:41:22 AM
Creation date
1/29/2024 11:41:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/21/1999
Control Number
1999-331
Entity Name
Oak Chase Development LLC
Subject
Contract for Construction Required Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />i <br />6.00 <br />6.01 <br />6.02 <br />6.03 <br />6.04 <br />6.05 <br />6.06 <br />6.07 <br />6.08 <br />6,09 <br />6.10 <br />7.00 <br />7.01 <br />7.02 <br />7.03 <br />7.04 <br />7.05 <br />7.06 <br />7.07 <br />7.08 <br />7.09 <br />7.10 <br />LIFT STATION & FORCE MAIN <br />Lift Station Wet Well and Vault <br />Lift Station Mech/Elec Package <br />Lift Station Telemetry Package <br />Lift Station Installation <br />4" PVC Force Main <br />4" DIP Force Main <br />4" Shut -Off Plug Valve <br />4" Tapping Sleeve and Valve <br />Backflow Preventer & Hose Bib <br />1" Water Service w/ Meter <br />OFF-SITE WATER <br />8" PVC Water Main <br />8" DIP Water Main <br />8" M.J. Gate Valve <br />8" 90 -Degree Bend <br />8" 45 -Degree Bend <br />Ditch Crossing Fittings <br />Re -Locate 2" Blow -Off <br />Temporary Sampling Point <br />Temporary Jumper <br />Marl/Shell Drive Restoration <br />I <br />1 <br />1 <br />1 <br />1,204 <br />41 <br />1 <br />1 <br />I <br />1 <br />369 <br />53 <br />1 <br />2 <br />3 <br />1 <br />I <br />2 <br />1 <br />170 <br />EACH <br />EACH <br />EACH <br />EACH <br />L.F. <br />L.F. <br />EACH <br />EACH <br />EACH <br />EACH <br />L.F. <br />L.F. <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />S.F. <br />$6,000.00 $6,000.00 <br />_ <br />$32,718.00 $32,718.00 <br />$8,200.00 $8,200.00 <br />$3,700.00 $3,700.00 <br />$5.75 $6,923.00 <br />$9.00 $369.00 <br />$350.00 $350.00 <br />$3,000.00 $3,000.00 <br />$500.00 $500.00 <br />$250.00 $250.00 <br />Sub -Total $62,010.00 <br />$13.35 $4,926.15 <br />$20.00 $1,060.00 <br />$575.00 $575.00 <br />$150.00 $300.00 <br />$200.00 $600.00 <br />$3,600.00 $3,600.00 <br />$300.00 $300.00 <br />$350.00 $700.00 <br />$1,500.00 $1,500.00 <br />$9.00 $1,530.00 <br />Sub -Total $15,091.15 <br />COST SUMMARY <br />Earthwork <br />Paving <br />Drainage <br />Sanitary Sewer (On -Site) <br />Potable Water (On -Site) <br />Lift Station & Force Main <br />Off -Site Water <br />Total <br />Letter of Credit Required (115% of Above'fotal) <br />Page 3 <br />$179,061.75 <br />$119,077.14 <br />$79,801.00 <br />$80,258.21 <br />$69,250.75 <br />$62,010.00 <br />$15,091.15 <br />$604,550.00 <br />$695,232.50 <br />CAItiorr it ig Hi triga <br />
The URL can be used to link to this page
Your browser does not support the video tag.