My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/6/1996
CBCC
>
Meetings
>
1990's
>
1996
>
8/6/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:51 PM
Creation date
6/17/2015 9:53:37 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/06/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEBASTIAN WATER EXPANSION PHASE I <br />PRELIMINARY ASSESSMENT SUMMARY <br />INDIAN RIVER COUNTY PROJECT NO. UW -95 -28 -DS <br />ESTIMATED TOTAL PROJECT CONSTRUCTION COST $2,960,000.00 <br />TOTAL BRISTOL STREET CONSTRUCTION COST $9,630.79 <br />ESTIMATED TOTAL ASSESSABLE CONST. COST $2,969,630.79 <br />PROFESSIONAL ENGINEERING <br />SURVEYING $74,260.00 <br />ENGINEERING $144,250.00 <br />INSPECTIONS $42,705.00 <br />ESTIMATED TOTAL ENGINEERING SERVICES $261,215.00 <br />A-Iffill <br />PREPARATION $15,685.00 <br />COUNTY UTILITIES ADMINISTRATION $49,102.00 <br />COUNTY UTILITIES ENGINEERING/ INSPECTIONS $28,000.00 <br />PERMITTING FEES ( F. D - E. P. $7,500.00 <br />ESTIMATED PROJECT EXPENSES $100,287.00 <br />ESTIMATED TOTAL PROJECT COST ($3,331,132.79) <br />( DUE TO ROUNDING -ASSESSMENT ROLL PRINTED) $3,331,139.94 <br />ESTIMATED TOTAL ASSESSABLE SQUARE FOOTAGE 23,802,560 <br />ESTIMATED ASSESSMENT COST PER SQUARE FOOT $0.13994850932 <br />ROUNDED $0.139949 <br />(CLERK'S NOTE: THE LENGTHY ASSESSMENT ROLE ATTACHED TO <br />THIS RESOLUTION CAN BE FOUND IN THE OFFICE OF THE CLERK <br />TO THE BOARD.) <br />31 <br />August 6, 1996 <br />B OK 98 F <br />
The URL can be used to link to this page
Your browser does not support the video tag.