My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/05/2023
CBCC
>
Meetings
>
2020's
>
2023
>
12/05/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 11:55:15 AM
Creation date
2/1/2024 11:32:58 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/05/2023
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
detail in the PD Plan Analysis section of this staff report. <br />Environmental Impacts: <br />Environmental issues are addressed in the PD Plan Analysis section of this report. <br />PD PLAN ANALYSIS: <br />1. Project Area: 52.96 acres (gross) <br />2. Zoning Classification: Current: A-1, Agricultural -1 (up to 1 unit/5 acres <br />RS -3, Residential Single -Family (up to 3 units/acre) <br />Proposed: PD, Planned Development <br />3. Land Use Designation: L-1, Low -Density Residential -1 (up to 3 units/acre) <br />4. Number of Units: 46 units (maximum) <br />5. Density: Proposed: 0.87 units/acre <br />Maximum: 3.00 units/acre <br />6. Open Space: Required: 40.0% <br />Proposed: 56.0% <br />7. Phasing: The project is proposed to be constructed in two separate phases. Phase 1 will consist of <br />the 34 single-family lots and most of the common area infrastructure. Phase 2 will consist of the 6 <br />remaining single-family units, 6 multi -family units (two townhome buildings), the fitness center, <br />and the staff parking area. <br />8. Utilities: The project will be served by public water and sewer service provided by County Utility <br />Services. The County Department of Utility Services and the Department of Health have approved <br />these utility provisions. <br />9. Traffic Circulation: Primary access to the overall project site will be provided via an existing <br />private roadway connection to Highway A1A, currently know as Ocean Run Lane, which currently <br />provides access to the north end of the Windsor PD project. A new, gated, resident -only private <br />roadway connection to Highway AIA is proposed along the north end of the proposed Windsor <br />North Village PD project. The new roadway connection will be served by a new southbound right <br />turn lane on Highway AIA, and that right turn lane will also be extended to serve the existing <br />private roadway connection for the Wabasso Estates Subdivision (110t' Place). The project also <br />proposes a new northbound left turn lane on Highway A 1 A to serve 110th Place and the new <br />northern roadway connection. <br />The project design also proposes several interconnected, internal roadway connections to the <br />existing Windsor PD project. Therefore, residents of the existing Windsor PD project will have <br />convenient internal access to the new fitness center, and can utilize the new northern roadway <br />connection. Similarly, residents of the proposed Windsor North Village PD project will be able to <br />utilize any of the Windsor PD project's existing roadway connections to Highway AIA. <br />C:\Granicus\Legistar5\L5\Temp\3fOc5f79-d413-41d1-8479-flac8476495f.docx 138 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.