Laserfiche WebLink
40 <br />►1 <br />Prepay transportation charges to Architect's office on samples forwarded. <br />4. Label each sample with material name, quality, Contractor's name, date <br />project name, other pertinent data. <br />it Ka -MMA <br />Y <br />When submissions are in the form of loose pages (approximately 8 112°" by 11" in <br />size), such shall be submitted in sets with each containing one of each drawing and <br />schedule submitted, assembled in portfolio binders showing on the covers of first <br />page inside a complete list of contents. Submittal of complete catalogues with one <br />or more items checked therein will not be accepted. <br />Submit Catalog Data and/or Installation Instructions by transmittal letter containing <br />project name. Contractor's name, description of submittal, date, other pertinent <br />data. <br />Contractor shalt review, thoroughly check and approve Catalog Data and/or <br />installation instructions prior to submitting to the Landscape Architect for approval. <br />At the time of submittal, the Contractor shall inform the Landscape Architect in <br />writing of any deviation in the submitted material from the requirements of the <br />Contract Documents. <br />Submit six (6) sets of each item for review. Satisfactory submittals will be so <br />identified, dated and three (3) copies resumed to the Contractor. Should an item be <br />disapproved, corrections will be indicated on one (1) copy only of the returned <br />data. <br />Re -submittals shall be in the sane Format as described above until such time as <br />approval is obtained. <br />Changes or corrections to Catalog Data and/or Installation Instructions shall not be <br />considered as an order for extra work. <br />}SART 3 - XEQ12TION <br />itulu■1: • _ 1: s►::l�rl <br />to <br />Submittals shall be in accordance with the following from date of Notice to Proceed: <br />IMM S -M ALs *q� ,per <br />L_ <br />All submittals required Fifteen (15) Days Fifteen (15) Days <br />*From date of receipt of submittal. <br />Delays on account of tardy or untimely submittals will not be considered as causes for <br />extension of time of the Contract or increases to the Contract Sum. <br />Color selection will not be released until all submittals requiring color selection are <br />submitted. The intent is to have all related color and texture availabilities together at one <br />time to determine a coordinated color schedule. <br />IB -3 <br />