Laserfiche WebLink
• <br />i <br />A. Unruly behavior of Contractor personnel WILL NOT BE TOLERATED. <br />Any person employed by the Contractor who does not comport himself will <br />be removed from the site wltcn requested by the Engineer and Owner. <br />B . No drinking of alcoholic beverages of any kind will be allowed on the <br />project site. <br />9.Ai�I�TlNU PE} AN Dt F Q <br />A. Parking of workmen's vehicles shall be coordinated with the Indian River <br />County Construction Inspector. <br />B. Any existing walls, curbs or pavements that ase removed for construction <br />installation shall be patched and maintained by the Contractor. <br />j C. Any existing utilities at the site that are affected by construction operations <br />shall be maintained, protected and repaired/replacrd by the Contractor. <br />10. FIELD MACE ALD EEM <br />The Contractor shall maintain his field office, sheds and storage areas on the site, at <br />locations approved by the Owner. <br />I <br />tD-1 <br />