Laserfiche WebLink
4& <br />r 4 <br />1 <br />1. SCOPE <br />A. The Contractor shall furnish all of the material, equipment, plant, labor, <br />transportation and supervision necessary so as to complete the Work as <br />+ shown on the Plans and specified herein. <br />2. GENERAL <br />A- Where structures or unsuitable material have been removed suitable backfill <br />or fill material shall be provided, placed and compacted to elevate the site <br />to the finish grade as shown on the grading plans. Pre -fill compaction shall <br />j be accomplished prior to this operation, as specified herein. <br />3. MATERIAL <br />A. fmigmLEM - All humus, peat, spongy material, roots, stumps, muck, <br />paving materials, and other objectionable materials shall be unsuitable for <br />backfill. Suitable material for backfill shall consist of sandy -loam, clayey - <br />sand, sand, gravel, soft shale, or crushed stone. The Engineer shall be the <br />N sole judge of what constitutes suitable and unsuitable material for backfill <br />other than those materials listed above. <br />B. Select F,jjj - Shall consist of uniform, clean, free draining sand, containing <br />less than 4% fates passing a No. 200 sieve. Laboratory test results of this <br />fill shall be submitted to the Engineer for his approval. <br />C, F;1trr MalCZWl - Shall consist of a washed sand containing less than 2% <br />fines passing a No. 200 sieve and must have a uniformity coefficient of 1.5 <br />or greater but not more than 4.0. Effective grain size shall be between 0.20 <br />and 0.55 millimeters diameter. <br />l 4. SORROW <br />A If there is not sufficient excavated material of a suitable quality to complete <br />the work, the Contractor shall provide and deliver the necessary suitable <br />additional material to the job site. <br />5. UNsiJTFABLE MATERIAL REPLACEMENT <br />A. Fill material shall be placed and spread evenly in layers not to exceed eight <br />inches before compaction. All fill material shall be free from vegetable <br />matter, wood, and other deleterious substances, and shall not contain rocks <br />or clods having a diameter of more than three inches. <br />B. If soil cement paving is proposed, local yellow sand or hard pan shall not be <br />used for the subgrade nor in the base. <br />6. pRE-FILL COMPACT -ION <br />A. Should the pre -fill surface elevation be below that required for the base of <br />proposed building foundations or paving subgrade, the areas within road <br />rights -of -ways, under parking areas, and the areas under and within five <br />feet of proposed buildings shall be precompacted. This precompaction shall <br />be performed equally on existing. ground and on surfaces which have been <br />excavated to remove unsuitable material. The top one foot of said areas <br />shall be compacted to a minimum density of 95% of maximum as <br />determined by AASHTO T-180. The maximum spacing between density <br />zc-t <br />k <br />