My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C_1 <br />7 <br />SECTION 21 - CEMENTED COQUINA SHELL BASE COURSE <br />1. DESCRIPTION ' <br />A. Under this item, the Contractor shall furnish all equipment. labor, <br />materials, and transportation necessary to construct a Coquina shell base <br />course upon the completed stabilized subgrade. The base course shall <br />be constructed in accordance with the lines, grades, and typical section <br />as shown on the Drawings. Unless otherwise rioted construction shall <br />conform to the provisions of Florida D.O.T. Standard Specifications for <br />Road and Bridge Construction, Section 2.50, 1991 Edition. <br />2. MATERIALS <br />A. - Coquina shell shall conform to the requirements of Florida D.O.T. <br />Standard Specifications, 1991 Edition, Section 915, and shall be from a <br />source acceptable to Florida D.O.T. The material shall have a minimum <br />LBR value of 100. Prior to placement, the material shall be crushed or <br />broken to such a size that no less than 97 percent by weight will pass a 3 <br />U2 inch sieve and no more than 20 percent dry weight shall wash <br />through a No. 200 sieve. No visible clay or organic matter will be <br />perrnitted. <br />3. PLACEMENT OF MATERIAL <br />A. After the subgrade is completed and approved, the Contractor shall <br />furnish and spread the coquina shell in a uniform distribution. Spread <br />thickness shall be a minimum of 9 inches. Segregated areas of fine or <br />course rock will not be permitted. Such areas shall be removed and <br />replaced with properly graded rock, <br />B. After the spreading is completed, the entire surface shall be scarified <br />and shaped so as to produce the required grade and cross <br />section after compaction, <br />4. COMPACTION <br />A. The required compaction of the coquina shell base course shall be a <br />minimum of 98 percent of the maximum dry density. <br />B. No less than 8-10 ton steel drum or pneumatic tired roller shall be <br />used to compact the base course. All depressions shall be filled and the <br />process of roiling and filling shall continue until a thoroughly <br />compacted uniform surface is produced. During final compaction <br />Operations, if blading of any area is necessary to obtain [lie true grade ; , <br />and cross section, the compaction operations for such areas shall be <br />completed prior to making the field density -compaction test on the <br />finished base. <br />C. Should the subgrade material become mixed with the base course material <br />at any time, the Contractor shall remove the mixture reshape and <br />recompact the subgrade, replace the materials removed with additional <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.