Laserfiche WebLink
C-1 <br />• <br />r <br />coquina shell and reshape and recompaa the coquina shell base at no cost <br />to the Owner. <br />" D. If cracks or checks appear in the base which would impair the <br />structural integrity of the base in the opinion of the Engineer, the <br />Contractor shall remove the cracks or checks by rescarifying, reshaping, <br />refilling with coquina shell where necessary, and recompacting at no cost <br />to the Owner. <br />E. The finished coquina shell base shall be checked for thickness at <br />intervals of not more than 300 feet. Any areas which are less than 5 1f2 <br />inches in thickness shall be corrected by scarifying and adding rock. The <br />{ scarifying shall extend for 54 feet either side of the deficient area. Areas <br />i which are less than 112 inch deficient in thickness shall be corrected if <br />the 'Engineer determines that the area is extensive or may adversely <br />affect the quality of the finished work. <br />5. PRIME COAT <br />A. The prime coat shall be a rapid curing liquid cut back asphalt equal <br />or equivalent to RC -70 or RC -250 at the Contractor's option. and <br />conforming to Sections 300 and 916-2 of the 1991 Edition of the <br />Florida D.O.T. Standard Specifications for Road and Bridge <br />Construction. <br />B. The surface of the base material shall be cleaned after final compaction <br />and the moisture content of the base shall not exceed 90 percent of the <br />optimum moisture before the prime coat is applied. The prime coat <br />shall be applied uniformly with a pressure distributor. The entire length <br />of the spray bar shall be set at the height above the surface recommended <br />by the Manufacturer for even distribution. The prime coat shall be <br />applied to the finished base course at the rate of 4.15 gallons per square <br />yard at a temperature between 1400 F. to 150 F. The prime coat shall <br />be applied such that a period of no longer than two (2) hours lapse prior <br />to application of the asphaltic concrete wearing course, unless the prime <br />Lcoat is covered with sand or screenings as outlined in Section 300-6.5 of <br />the 1991 Edition of the Florida D.O,T. Specifications, <br />6. TESTING <br />A. The maximum density and optimum moisture shall be <br />determined in accordance with the Modified Proctor Test procedures of <br />ASTM -D1557 or AASHTO-T180 (Method D). The percentage <br />Iw compaction and in-place density shall be determined according to <br />procedures of ASTM -132167 "Test for Density of Soil In -Place by the <br />Rubber Balloon Method" or the nuclear method ASTM- D2922. In <br />it general, one Modified Proctor Test per 300 lineal feet of roadwork <br />shall be performed on a representative sample of base material front <br />location(s) desif fated by the Engineer. In-place density testing <br />shall be performed at the rate of one test per 300 lineal feet of <br />