I-] <br />a <br />not be permitted. =Asphaltic concrete whose temperature is less than <br />210 F when delivered to the job site may result in immediate <br />rejection from application by the Engineer. All material rejected <br />by the Engineer shall be replaced with specified material by the <br />Contractor at no additional cost to the Owner. <br />B. The asphaltic concrete shall be applied by an approved type of self <br />propelled paver, such as a Barber Green, capable of making a <br />continuous 10 ft. wide pull. The paver shall have a disbursing hopper, <br />a compacting devise, and a screed capable of adjustment to produce <br />the required paving cross section. The screed shall be equipped with <br />heaters. <br />C. Immediately after the asphaltic concrete is spread, any deviations from <br />the typical section shall be remedied by placing - additional <br />material or by removing surplus material while the mixture is still hot. <br />D. Rolling should begin as soon as possible after the asphaltic concrete has <br />been spread as specified. Rolling of the longitudinal joint should be <br />immediately behind the paving operation. The initial pass with the roller <br />should be made as soon as it is possible to roll the bituminous mixture <br />without cracking the mat or having the mix adhere to the roller wheels. <br />E. The rolling shall be done by a "Rolling Train", consisting of a steel wheel <br />sea] roller, and a pneumatic tired traffic roller and a steel wheel finish <br />roller. All of which shall be on the job when the asphalt laying <br />commences and remain on the project until the paving work has been <br />completed. <br />F. Rolling of the longitudinal joint should be immediately behind the <br />paving operation. The initial pass with the roller should be made as <br />soon as it is possible to roll the bituminous mixture without cracking the <br />mat or having the mix adhere to the roller wheels. To prevent adhesion of <br />the mix to the roller, the wheels should be kept moist with only enough t <br />water to avoid picking up the material. <br />G. Steel wheeled rollers shall be of the tandem type. For seal rolling, <br />these rollers shall weigh between 5 and t2 tons and for final rolling, they <br />shall weigh between 8 and 12 tons. <br />H. Traffic rollers shall be of the self propelled pneumatic tired type, <br />equipped with at least seven (7) smooth tread, low pressure tires. with the <br />tire pressure maintained between 50 to 55 pounds. Traffic rollers shall <br />weigh between G and LO tons. Wobble wheeled rollers are prohibited r <br />from rolling on this project. <br />I. The speed should not exceed 3 mph for steel wheeled rollers or 5 mph t <br />for pneumatic tired rollers. <br />Finish rolling should be done while the material is still workable <br />enough for removal of roller marks, before the pavement temperature L. <br />has dropped below 1400 F. Abrupt turning of rollers on the paving <br />mix which causes undue displacement shall not be permitted. <br />L <br />W <br />