My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNI • ► >r0t rlrw700191 PIN I <br />1.�nqll a <br />a I W I Lai <br />1 2. <br />3. <br />A. Work under this heading consists of furnishing and installing conduits <br />under the mads at the locations shown on the flans. <br />INSTALLATION <br />A. The conduit shall be installed prior to the construction of the paving <br />subgraade. The conduit shall, unless otherwise noted, be PVC, SCH 40 <br />pipe. Unless otherwise noted, the conduit shall be 4 inch diameter and be <br />installed with 42 inches cover at the centerline of the mad. All conduit shall <br />extend a minimum of four feet beyond the edge of the pavement or, if there <br />is a curb, the back of the curb. <br />B. - The pipe shall be installed straight, level and in strict accordance with <br />the manufacturers recommendations. Backfill shall be compacted in <br />uniform layers to a minimum of 100% of maximum dry density per <br />AASHTO T-180. <br />LOCATION MARKING <br />A. The Contractor shall accurately mark die location and depth of the ends <br />of the conduits by a method which will allow the utility company to <br />readily locate the ends. The Contractor shall also deliver to the Engineer <br />an "AS BUILT" drawing showing the location of the conduits with <br />reference to man holes, street intersections, lot comers or other permanent <br />references. <br />4. AS-BUILTS <br />A. During the installation of utility conduits the Contractor shall keep <br />accurate records of the As -Built construction showing the location and <br />burial depths of all utility conduits. All conduits shall be referenced from <br />permanent objects such as manholes, valves, etc. Upon completion of the <br />project the Contractor shall deliver to the Engineer an As -Built <br />Drawing showing the above information. <br />5. PAYMENT <br />A. Payment for this item shall be on a lineal foot basis for each <br />diameter specified and shall include the cost of all labor, tools, materials, <br />compaction, and equipment necessary to complete the work in accordance <br />Lwith the Plans and Specifications. <br />21-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.