My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01 <br />11 <br />SECTION 6B - LUMBER <br />1. GENERAL. Framing and finish lumber shall be marine duty pressure treated dense <br />Southern Yellow Pine, straight and true. Material shall be kiln dried to maximum <br />19% moisture content prior to preservative treatment. Preservative treatment shall <br />be as specified by the American Woad Preserver's Association, <br />2. MATERIALS: Factors and grades as follows, unless otherwise noted on drawings: <br />A. Unless otherwise noted all wood shall be hand selected #2 grade, <br />structurally sound southern yellow pine CCA pressure treated at 2.5#Ic.L <br />retention rate per AWPA specifications.. <br />B . Roof decking shall be hand selected #2 grade, structurally sound southern <br />yellow pine CCA pressure treated at .40#Ic.f. retention rate per AWPA <br />specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.