My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />I <br />6. f3id Security <br />6.1. Bid Security shall be made payable to Owner, in the amount specified in the <br />Bid Form and in the form of a certified check, cashier's check, treasurers <br />check or bank draft of any national or state bank or a Bid Bond(on the farm <br />attached) issued by a Surety meeting the requirements of paragraph 5.1 of <br />the General Conditions. <br />6.2. The Bid Security of the Successful Bidder will be retained until such Bidder <br />l has executed the Agreement and furnished the required Contract Security, <br />whereupon it will be returned; if the successful Bidder fails to execute and <br />deliver the Agreement and furnish the required Contract Security within 15 <br />days of the Notice of Award, Owner may annul the Notice of Award and the <br />Bid Security of that Bidder will be forfeited, The Bid Security of any Bidder <br />whom Owner believes to have a reasonable chance of receiving the award <br />may be retained by Owner until the earlier of the seventh day after the <br />"effective date of the Agreement" (which term is defined in the General <br />Conditions) and the required Contract Security is furnished or the sixty-first <br />day after the Bid opening. Bid Security of other Bidders will be returned <br />within sixty days of the Bid opening.. <br />The number of days within which, or the date by which, the Worts is to be completed <br />(the Contract Time) is set forth in the Bid Form and will be included in the <br />r Agreement.. <br />8. ILgI dl ated. Damages <br />It is understood and agreed that if the project is not completed within ninety (90) <br />calendar days from issuance of a Notice to Proceed, the County will apply <br />liquidated damages of $100/calendar day. The damages will be deducted from <br />monies due the Contractor, not to exceed the total contract price_ <br />9. i stitute Material and Equipment <br />The Contract, if awarded, will be on the basis of material and equipment described <br />in the Drawings or specified in the Specifications without consideration of possible <br />substitute or "or-equai" items. Whenever it is indicated in the Drawings or specified <br />in the Specifications that a substitute or "or -equal" item of material or equipment <br />may be furnished or used by Contractor if acceptable to Engineer, application for <br />such acceptance will riot be considered by Engineer until after the "effective date <br />of the Agreement". The procedure for submittal of any such application by <br />Contractor and consideration by Engineer is set forth in Paragraph 6.1 of the <br />General Conditions. <br />117. 5ubcontracrs, eta. <br />k <br />k <br />INSTnUCTIONS TO BIDDERS <br />IB -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.